Laserfiche WebLink
P�rojeot F epre entati e's Dail Report� l� Pogo 1 of � <br /> Report No. 75 <br /> Date: 11115196 <br /> Architect: Strekalovsky&Holt, Inc. Day: F <br /> Project: ashpee Town Hall Contractor "A ostino Associates <br /> Superintendent: Len Paoletta <br /> Weather 8:00 AM Noon: Snow flurries X11. <br /> Temperature: 8:00 AM Noon: 3 <br /> Pit. 3 <br /> PERSONNEL COUNT Spec. Contractor <br /> p Trade Workforce <br /> Sect. Foreman Joufneymen Helpers Total <br /> al <br /> General <br /> Contractor. <br /> f ' gostrno lob Supt. <br /> Bridgewater Steel <br /> Subcontractors: <br /> 2 <br /> Windows <br /> Electricians <br /> 4 <br /> Plumbing <br /> 2 <br /> Fire Pro tecdon <br /> HVAC I <br /> 7 <br /> TOTAL 191 <br /> Notes: Temp heat in bldg. is running-avg. temp is 60 F on 1st floor. Window <br /> are <br /> being installed on back of building. Iron workers are installing stair treads in <br /> stair#2. Concrete slab has been poured in the Exec. Secy. office. insulation <br /> and sheet rock are being installed on 1st level. Mote the Building Inspector has <br /> issued a lefter to Len Paole to to stop street rock and insulation as of end of day. <br /> Y <br /> Lower level block infill proceeding. Sprinkler lines being fabricated and installed. <br /> Number Ivey to inspection Notes: <br /> 1.Work performed by General Contractor 10,Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs,, instigator,action <br /> .Work items or extra started taken,contrs.seeking co pen.,Item,labor and <br /> 4.Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> 6.Serious accident 1 .Material and equipment for installation received, <br /> 7. and reasons compliance to sped. <br /> .Testing or inspection 1Work not meeting specifications <br /> g. Equipment r�site 15.Items in 14 not corrected. <br /> Copies to: Staff Signed: <br />