My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:11:03 PM
Creation date
4/24/2019 1:40:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ProjectRepresentative's Daily Report Page 1 of � <br /> Report No. as <br /> Date: 1214196 <br /> Architect: Strekalovsky& Holt, Inc. Dart': VII <br /> Project: M shpee Town Hall Contractor D"Agostino Associates <br /> Superintendent: Len Pa letta <br /> Weather: 8POO AM Noon: Sunny 4PMO* <br /> Temperature: 8:00 AM Noon: 46 4Pll: <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D'A ostino I Job Supt. 7 1 <br /> Subcontractors: <br /> Ceiling <br /> Elevator 2 2 <br /> Pipe <br /> Window 3 3 <br /> Paint <br /> Masonry 2 1 3 <br /> Electrician 4 4 <br /> Plasterers 3 <br /> Pipe Insulators <br /> TOTAL <br /> Notes: site meetings at 1 p.m. Walk-through-througrh con luded at 2:30 p.m. Masons doing <br /> infill around elevator d or`fra a openings. Painters working on first level corridor <br /> and offices. Ceiling grid being installed In first level corridor. Pipe fitters working <br /> on ground lural boiler room area. Demolition of existing masonry wail on ground <br /> lural ongoing. Window blocking and frames being installed on front of building. <br /> Number Key to InspectionNotes: <br /> 1.Work performed by General contractor 10.site meeting participants and discussion <br /> .Work performed by subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contr .seeking compen.,item,labor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> 8.Testing or inspection 14.Work not meeting specifications <br /> .Equipment on site 15. Items in 14 not corrected. <br /> Copies to: Staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.