My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
12/18/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:11:03 PM
Creation date
4/24/2019 1:40:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
w <br /> Project Representative's Daily Report Page I of <br /> Report No. 86 <br /> Date: 7215196 <br /> Architect: srekalovsky& Hoit, Inc. Day: TH <br /> Project: #ashpee''Town ball Contractor "Agostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM Noon: PM: <br /> Temperature: 8:00 AM Moon: 4PM: <br /> PERSONNEL COUNT Spec. Contractor grade Workforce <br /> e <br /> Sect. Frernan Joumeymen Helpers Total <br /> General <br /> Contractor <br /> 'Agostino 1 .Job Supt. <br /> Subcontractors: <br /> Steel 2 <br /> Plumbing 7 7 <br /> !feat Pipe <br /> Electrical 4 4 <br /> Fire Protection 2 2 <br /> Plasterers <br /> Masons 2 2 <br /> Elevator 2 2 <br /> Paint <br /> Tile Ceramic I <br /> Ceiling 7 7 <br /> TOTAL 2 <br /> Dotes: Painter working on first level. Ceramic the being installed on first level bathroom. <br /> Elevator installation ongoing. X ll joints and screen holes taped and skim coated <br /> In main meeting area. Window installed on front of building. sheet rock being <br /> installed on ground floor. Metal fascia installed on perimeter of flat roof areas. <br /> Steel workers working on ground floor installing steel beans. <br /> Number Key to InspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from pians and specs.,instigator,action <br /> .Work items or extra started taken,contrs.seeking compen.,item,labor and <br /> 4.Work items or extra completed material <br /> .Potential or encountered delays 12.Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> . Equipment on site 1 . Items in 14 not corrected. <br /> Copies t : staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.