Laserfiche WebLink
f , <br /> Proposed Project Schedule <br /> U7 M to to W W M <br /> n W Ln L M Ln <br /> LO Ln M U1 LO M M M M M 0 M M <br /> Mashpee Town Office <br /> W c i coo M oo n � o civ �- <br /> O -,%% U <br /> c c <br /> 00 1 0 0 0 0 0 - -- <br /> AS-BUILT CONDITIONS (3 weeks) } <br /> } <br /> SPACE PROGRAMMING IMIN (2 weeks) <br /> Receive Completed Questionnaire <br /> Review with Department Heads <br /> } <br /> Review with Building Committee <br /> SCHEMATIC DESIGN (3 weeks) <br /> Present Preliminary Schematics <br /> Ell <br /> Review / Finalize <br /> DESIGN DEVELOPMENT (4 weeks) <br /> Review with Building Committee <br /> Review with Building Committee <br /> } <br /> CONSTRUCTION DOCU ENT (6 weeks) <br /> BIDDING (4 weeks) <br /> Advertise <br /> CONTRACT AWARD (2 weeks) <br /> CONSTRUCTION OCCUPANCY (36 weeks) <br /> s <br /> Strkalvsky Holt, Inc. <br />