My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/20/2018 DESIGN REVIEW COMMITTEE Minutes
>
11/20/2018 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2019 6:59:12 PM
Creation date
4/26/2019 10:08:32 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minutes of Meeting <br /> Design Review Committee <br /> Held Tuesday, November 20, 2018 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Mr. Furbush read the bylaw..."building signs are allowed to be up to 10%of the aggregate <br /> sq. ft. of the front wall area of the building, with wall areas measured as total width times <br /> average height of the wall elevation being measured." He asked what was the percentage <br /> of the sign? <br /> Mr. Brooks said measuring the eve of the building is 60 ft,wide by 18 ft. tall, which is 1,080 <br /> sq. ft. (48.35 sq. ft.). <br /> Mr. Mendoza asked if there any signs are being proposed for the location of the parking <br /> area, and for the storage building. Mr. Mendoza said that if there are any signs for the <br /> storage building, the application will need to return to the committee. <br /> Mr. Brooks said there is no sign at this time but there might be an 'office"sign or a sign on <br /> the locked door of the warehouse that says"deliveries". <br /> Mr. Cummings had no more comments. <br /> Jonathan no more comments. <br /> Jonathan made a motion to approve the two signs for RCA Electric Electrical Contractors <br /> at 20 Evergreen Circle as presented with all of the comments that were read into the record. <br /> Mr. Cummings seconded. Motion is second. No further discussion. <br /> All were in favor of the signs for 20 Evergreen Circle. <br /> NEW HEARING <br /> Business name: ABC Supply Co. Inc. <br /> Project Address: 68 Echo Road <br /> Owner:Louis Seminara Jr. <br /> Agent: Egan Sign <br /> Requests: Building Wall Sign- 108.4 sq. ft. and a street sign; 14 sq. ft. each side. <br /> Mr. Adam Abelha, with Signature SIGNS represented the owners of 68 Echo Road, and <br /> their tenant ABC Supply Co. He supplied the committee with the two signs that will be <br /> installed, one is the building sign and the other is a pylon sign. He said the original paper <br /> work indicated a measurement for the building sign that was incorrect, it reference 108.4 <br /> sq. ft., and should be 92.37 sq. ft. Accord to the code requirement the frontage sq. ft. is <br /> 1,080 sq. ft., the sign will be 92.37 sq. ft. The sign depicting "ABC' is a stud mounted <br /> aluminum channel that bolts thru the building. The second portion of the sign is "Supply <br /> Co. Inc."which is an aluminum navy color panel that will also be bolted to the building. <br /> Mr. Mendoza asked if the blue color shown for the"Supply Co. Inc. is the actual color and <br /> is the square footage exceeded? <br /> Mr. Abelha said yes. The Egan Sign created it as a box when they did their measurements, <br /> but the actual signs measure at 92.37 sq. ft. which is under the 94 sq. ft. allowed. The total <br /> of the two signs total 92.37 sq. ft. <br /> Mr. Mendoza asked if the building sign will be illuminated. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.