Laserfiche WebLink
Minutes of Meeting of <br /> Mashpee Design Review Committee <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Tuesday, July 17,2018 <br /> Matt said that the proposed development consists of eleven(11)buildings fronting the units <br /> along the fairway. There will also be a meeting house with an in-ground pool. There are no <br /> interior property line setbacks and will construct right up to the parcel line between the <br /> developed area and golf course.There is a 40 ft. setback of the entire Willowbend perimeter <br /> that would apply along Sampsons Mill Road, and then down along the property line of the <br /> golf course parcel. These buildings are duplex town homes,five of the buildings are called <br /> the "Willow" and are approximately 2,600 sq. ft. in with a garage, golf cart storage, and <br /> individual driveways. There are also six slightly smaller town homes that are called the <br /> "Fairways", and are approximately 2,100 sq. ft. with a garage, individual drive way. There <br /> is a total of 22 units. The lot coverage within this parcel is approximately 13%and is under <br /> the 30% allowed by Zoning. <br /> The proposed entrance will be cutting in a new road through Sampsons Mill Road, 22 ft. <br /> in width. The proposed max slope is about 5%, all in conformance with design <br /> requirements. There is two parking spaces per unit, and accommodating a garage and <br /> driveway space up to two cars. <br /> Matt pointed out that the only proposed work within the 200 ft. river front is a slight piece <br /> of grading, and will require a filing with Conservation for an RDA and has very minimal <br /> impact. There is no Zoning Board filing required. <br /> Mr.Mendoza commented that Lot A on the plan depicts a lot of vegetation along Sampsons <br /> Mill Road compared to Lot C which looks likes wide open. He would like to see some <br /> shrubs and trees along that road way to separate between the road way and houses similar <br /> to what shows on Lot A. He would like a revised plan. <br /> Mr. Mendoza said if the property line between Lot A and Lot C is gone,under the building <br /> code standpoint, the property line going through the middle of the building, and the closer <br /> you get to a property line, you increase the rating of the wall which means there needs be <br /> a diagonal fire rated wall running through the building. <br /> Matt pointed out that the existing property line will be removed and.this was already <br /> approved by the Planning Board. <br /> Matt commented that the project has gone through a significant grading and drainage plan <br /> with the storm water facilities management throughout the development and meeting with <br /> the Mass DEP regarding storm water polices. <br /> Mr. Mendoza asked about lighting. Matt said lighting has not been laid out for this project, <br /> but they generally follow the Cape Cod Commission technical Bulletin 95. <br /> Mr. Cummings had a question regarding the guard rail fall protection behind the Fairway <br /> homes. Matt said that it's a retaining wall with segmented interlocking material. <br /> 2 <br />