Laserfiche WebLink
Mashpee Sewer Commission <br /> Meeting Minutes <br /> Thursday, May 16, 2019 <br /> Present: Tom Fudala, Joe Lyons and Brad Pittsley. Also in attendance was Andrew Gottlieb, Executive Director of the <br /> Association to Preserve Cape Cod. <br /> Meeting Called to Order: 7:05 p.m.—Ockway Meeting Room, Mashpee Town Hall, 16 Great Neck Road North, Mashpee, <br /> MA 02649 <br /> Approval of Minutes: Joe Lyons moved to approve the minutes of the March 21, 2019 Sewer Commission Meeting with <br /> one minor correction. Motion seconded by Brad Pittsley. VOTE: Unanimous (3-0) <br /> Status of Final Plan: Mr. Fudala informed fellow Commissioners that the Watershed Nitrogen Management Plan has <br /> received all the necessary approvals. No Implementation has begun other than limited shellfish propagation and preliminary <br /> designs for the WWTP. Natural Resources Director Rick York has received the results of the 2018 Waquoit Bay watershed <br /> testing, which show very good improvement to the water quality. Seed from the shellfish has been making its way out to <br /> Waquoit Bay, increasing commercial harvest there; however, more shellfish is needed. Mr. York has a new piece of state <br /> of the art equipment that identifies larvae,which will be set-up in Popponesset Bay. He does not yet have the water quality <br /> results for Popponesset Bay or the Mashpee River, <br /> FY 2020 Budget Status Report: Mr. Fudala reviewed the status of the Sewer Commission Administrator position, which <br /> has not been filled. Town Meeting did approve $10,200, and the Town Manager has indicated he will set aside $25,000 <br /> from the Town's Legal&Engineering budget for WWTP preliminary design value engineering. Town Meeting also approved <br /> the DPW Assistant/Engineer position,which is intended to provide support to the Commission as an alternative to the Sewer <br /> Commission Administrator position. <br /> GHD WWTP Preliminary Design Project: Mr. Fudala reviewed the status of Selectmen and finance team discussions <br /> regarding financing and organization of wastewater system Implementation. Both funding articles for the final design of <br /> the WWTP and the design of the collection system were submitted for inclusion on the Town Meeting Warrant, but both <br /> were taken off the Warrant prior to Town Meeting. The preliminary design project itself is moving along, Survey stakes <br /> that were placed in the vicinity of the Transfer Station sparked concern among residents in the area, and the subsequent <br /> spread of false information resulted in a lot of opposition to the proposed articles. At the most recent joint meeting on <br /> economic development, inquiries were made with private Mashpee developments with sewage treatment plants about odor <br /> problems from those plants, and the response across the board was that there were no issues. We need to get word out <br /> that we are building small contained facilities that will not smell. <br /> Mr. Lyons asked what was delaying the Waquoit Bay IMA with Falmouth and Sandwich, and Mr. Gottlieb responded that he <br /> has not yet had the time to dedicate to it. Part of the delay was due to each town engaging its own technical consultants <br /> to do the load sharing calculations. The towns have agreed to the form of the agreement, which will parallel the IMA for <br /> Popponesset Bay. A DLTA grant from the Cape Cod Commission (CCC) was used to reimburse Sandwich for legal costs <br /> associated with the preparation of the agreement for Popponesset. <br /> Mr. Gottlieb shared his opinion that the analysis prepared by the finance team was inadequate, biased, and appeared to <br /> him to be intended to scrap the project. It overemphasized negative assumptions and undervalued positive ones, creating <br /> the most expensive possible scenario and assuming no revenue. Additionally, it attempted to look at the first three phases <br /> of funding, as opposed to the first five-year phase of funding,which made the numbers appear big and unaffordable. He <br /> and Selectman John Cotton met with the finance team, and Selectman Gottlieb provided comments. The finance team <br /> agreed with some but not all of their comments. A re-draft of the analysis will be presented at some point in the future. <br /> The analysis did serve to bring up the fact that there are a number of policy questions which need to be decided—such as <br /> connection fees, betterments and rates—so that the Commission can provide guidance that will allow the finance team to <br /> start to plug the revenue streams into a financial model. In the absence of those pieces, the assumption Is that it is all <br /> borrowed money, adding to the Town's overall debt burden. Mr. Gottlieb stated that, while at this point we do not know <br /> what the numbers are to plug.in, we don't want those numbers to look bigger and scarier than they necessarily need to be. <br /> 1 <br />