My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/22/2019 ZONING BOARD OF APPEALS ZBA Decision
>
05/22/2019 ZONING BOARD OF APPEALS ZBA Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2019 5:00:52 PM
Creation date
8/2/2019 3:04:37 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
ZBA Decision
Meeting Date
05/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Glenn Thompson and Coreen A. Thompson <br /> 175 Daniels Island Road (Map 100 Parcel 41) <br /> Mashpee, MA 02649 <br /> SP-2019-28 <br /> The existing structure is a four bedroom, single family residential structure, with a <br /> pier float and dock complex as part of the existing conditions. The Thompson's request <br /> from the Board is a Special Permit, and to afford them the opportunity to raze and replace <br /> the structure with a new code compliant two story, four bedroom single family residential <br /> structure, with a small patio, and a pool in the rear of the structure. The new structure is <br /> within the boundaries of the existing footprint of the current structure. There is no creation <br /> of any new non-conformities, and are improving some of the non-conforming conditions <br /> that currently exist. <br /> The front setback is currently 26.1 ft., and will be extended to 27.2 ft. The side yard <br /> setback is currently 7.8 ft., and is extending to 9.8 ft. The wetland setback is 34 ft.,and will <br /> improve to 40.7 ft. The current lot coverage is 23.8% and is being reduced to 23.6%. The <br /> Board can determine under the existing bylaw whether or not any new non-conformities <br /> are being created. There are no new conformities being created, and that the new structure <br /> is a substantial improvement rather than a substantial detriment to the neighborhood as it <br /> is proposed.The structure will conform to current day building and flood plain code criteria <br /> so that construction will be an improvement to the neighborhood in the event of any <br /> significant storm events. He provided the Board with architectural plans prepared by <br /> Architect Associates. <br /> Jonathan Furbush, Chairman mentioned that he has some concerns raised by the <br /> Board of Health that he read into the record. "The new foundation is 2 ft. closer to the septic <br /> tank and SAS than the existing one. Therefore, the setbacks to the septic system require <br /> Title V variances with abutter notifications. The variance review will require board <br /> approval. The septic system has been inspected. The floor plans were reviewed and are <br /> acceptable for four bedrooms. " <br /> Attorney Kirrane was informed of these comments late in the afternoon the same <br /> day, and he consulted with the engineer and building designer. The engineer followed up <br /> with Glen Harrington with an email late in the day just before the meeting. Mr. Kirrane <br /> said there were two scenarios discussed that would address these particular concerns <br /> without the need of variance relief from the Board of Health. There is an ability to put <br /> sheathing along the front of the foundation with impervious material, and there is also the <br /> possibility of canter levering a portion of the dwelling in that area over the foundation so <br /> that the foundation is still beyond the 2 ft. without getting 2 ft. closer. There is also the <br /> possibility of creating a crawl space in that area rather than a full basement with the <br /> sheathing. These are the solutions that can be addressed during the construction. Glen may <br /> have not had the opportunity to respond to that email from Tom Bunker, BSS Design. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.