My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/22/2019 BOARD OF SELECTMEN Minutes
>
07/22/2019 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2019 5:01:56 PM
Creation date
8/8/2019 3:05:47 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
07/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7 <br /> Board of Selectmen <br /> Minutes <br /> July 22, 2019 <br /> APPOINTMENTS & HEARINGS <br /> Discussion and Approval of Award of Contract for Storage Garage for the Department of Public <br /> Works: Catherine Laurent: <br /> Catherine Laurent, Director of Public Works was in attendance to recommend the Board award a <br /> contract for the pre-engineering storage garage for the DPW to Collins Construction Co., Inc. in the <br /> amount of$174,050. <br /> Ms. Laurent indicated the project was bid on three occasions. No bids were received with the first <br /> issuance of a RFP. The second and third RFP received one bid response, same bidder. The pre- <br /> engineered storage garage for construction, a 42x60' building to be located at the DPW would house <br /> small equipment currently kept outdoors. Equipment to be stored includes chippers, tractors and <br /> smaller equipment generally left without protection from the elements. <br /> The Capital Improvement Program (CIP) Committee approved and recommended a budget of <br /> $125,000 to the May 2018 Town Meeting. The overage was approved by the CIP earlier this month. <br /> The balance of the 174,050 project would be paid through funds available in the CIP bond to move the <br /> project forward. <br /> Town Manager Rodney C. Collins recommended approval. The DPW has articulated the need for <br /> additional storage, and this project has been in the CIP for a number of years. It was noted the third <br /> bid represented a 14% decrease from the second bid although the cost is in excess of the initial CIP <br /> funding. <br /> Motion made by Selectman Cotton to award a contract for the DPW Storage Garage to Collins <br /> Construction in the amount of$174,050 with funding to derive from the CIP as referenced. <br /> Motion seconded by Selectman O'Hara. <br /> VOTE: Unanimous. 4-0. <br /> Roll Call Vote: <br /> Selectman Gottlieb,yes Selectman Cotton,yes Selectman O'Hara,yes <br /> Selectman Sherman,yes Opposed, none <br />
The URL can be used to link to this page
Your browser does not support the video tag.