My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/12/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
08/12/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 5:24:11 PM
Creation date
8/21/2019 9:51:02 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
08/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> f mrw <br /> CO Continue development of Regional Memorandums of Understanding (this will also influence long- <br /> term <br /> ng-tarn implementation of areas within the neighboring communities). <br /> CO Fertilizer management bylaw implementation. <br /> CO Continued use of stormwater BMPs. <br /> The following Phases 1 through 5 (divided into 5-yearincrements) are depicted in Figure ES-2 and were <br /> included in various, Phases based on considerations for areas targeted for shellfish and on each subarea's <br /> relative rankings established in chapter 4 (Table 4- 2 . <br /> 2017-2 21Phase <br /> CO File Notices of Project change and De elopment of Regional Impact (DRI) modifications (as <br /> needed/if required) to inform (and gain approval from) the environmental review process on the <br /> agreements and funding that will allow the next steps to proceed. <br /> Shellfish Propagation expansion in related sections of Popponesset Bay and addition in , ehu <br /> Pond and Hamblin Pond). <br /> 00 Feasibility,study: Implementing Soft Solutions for Restoring the ashnet/Moo�nakis River. <br /> 00 Feasibility study on connection of Quashnet and Coombs Schools to Mashpee commons WWTF. <br /> Implement findings of Quash net net/Moonakis River soft solutions (if favorable). <br /> 00 Design and Construction of Site 4 facility (Phase 1) to serge sections of Subarea S (within <br /> 1ashpee River Watershed)adjacent toFalmouth Road/Route 28. <br /> Go Cosign and construction of related collection system to serve S,ite 4 WWTF. <br /> CO Design and construction of collection system to extend to properties neighboring the Warnpanoag <br /> WWTF.. <br /> 00 End of Phase compliance reporting—consider updating MEP Model runs (landuse and <br /> hydrodynamic models)and MEP calibrate with water quality and benthic flux,sampling as needed. <br /> 00 Determine additional evaluations of, existing wastewater treatment facilities loading into next <br /> phase of proposed improvements. <br /> CO Coordinate with 208 Plan and potentially run ccc MVP tool in conjunction with MEP Model runs <br /> to check on updated water data and possible adaptive management approaches. <br /> The estimated cost for Phase I infrastructure and lona-term shellfish im�plernentation is summarized in <br /> Table CS-4. <br /> (continued) <br /> 8612001.4 Town of Mashpee Sewer Commission on S- 3 <br /> Final RecommeMed Plan/Final Environmental Impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.