My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/12/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
08/12/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 5:24:11 PM
Creation date
8/21/2019 9:51:02 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
08/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table ES-4 Estimated Tafel Present Worth Cost of a n s a raw hale <br /> 1, <br /> / i 11��.�gV'�jf r ;fr,./r,,,,.ur rfir/�„rii/i�../9/✓r,,,,,,a rrm,,.r... .�� � ����VJf� <br /> Capital Costs <br /> Shellfish Aquaculture yr (6). 11500,000 <br /> Collection System $20,000,000 <br /> Treatment System (2,3) $11 1 r <br /> Recharge facility(3,4) $1,,500,000 <br /> Total <br /> Costs <br /> Shellfish Aquaculture $1,5001000 <br /> Collection System $1003000 <br /> Treatment System $1,300,000 <br /> Recharge Facilities $301QOO <br /> Ta <br /> ,/p�900,00,0 <br /> Present Worth O&M (5) $44,1000,000 <br /> $7801-000"000 <br /> To all P re's' ,ehft Worth <br /> Notes: <br /> 1. Va'lues are rounded to two significant figures and include allowances for fiscal, legal and engineering services, and <br /> contingency. Based on an ENR year of 2017. <br /> 2. Treatment nests include new facilities and improvements/upgrades to existing facilities. For neighboring communities of <br /> Barnstable and Sandwich, collection, treatment, and recharge nests were estimated for planning purposes only; actual <br /> location,technology type,and site considerations would need to be detenTrined by each individual community. <br /> munity. <br /> , Allowances for facilities located in Sandwich (not including those proposed to connect to JBCC)and Barnstable(Falmouth <br /> assumed to go to JBCC). <br /> 4. Estimated costs with shellfi h aquaculture presume that existing and future loads are managed through this; adaptive <br /> management approach,Joint Base Cape Cod is available,and no additional recharge capacity is required. <br /> 5. Based on 20 years;and 3%interest. <br /> 6. Coat does not include Town staff which is currently funded by the Toon through their existing program(s), <br /> 022.2 wase <br /> File latices of project Change and DRI modifications as necessary)to inform (and Cain approval <br /> from) the environmental review prece�s on -the agreements and Banding ,that will allow the next <br /> steps to proceed, <br /> CO Shellfish Propagation (continuation and future expansion). <br /> 8612001.4 Town of Mashpee Sewer CommissionES-1 4 <br /> Final Recommended flan/Final Environmental Impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.