Laserfiche WebLink
CO Design and Construction of JBCC Improvements, (or Back Road Site facility if agreement cannot <br /> be reached on a regional facility)" <br /> Design and Construction of J CC/Back Road Sewer Extensions (Mashpee)to serve Subarea H. <br /> 00 If Quash net/Moo nal is soft ,solutions will not address 100% nitrogen TMDL and regional facility a <br /> JCC is available, Sand-1, -2, and -3 should begin process of being connected to address the <br /> Q " <br /> uashnet diver area, �� should portions � Falmouth din coordination/conjunction �rv�th any efforts <br /> regarding their plan and their demonstration projects being considered in that area). <br /> 00 Connection of Quashnet and Coombs Schools to Mashpee Commons WWT , upgrade as <br /> required" <br /> Go If shellfish propagation is not advancing as fast as or to the levels anticipated: <br /> Site 4 facility expansion (phase 2) development to serve additional Mashpee River and <br /> ,Popponesset Bay Watershed Mashpee (south of Route 2 with new recharge facilities at <br /> 'villorbend" <br /> Upgrade of Willowbend facility. Upgrade of Stratford Ponds, South Cape Village, and <br /> Windchime Point to improve nitrogen removal performance in conjunction with age of system <br /> improvements" <br /> — Mashpee liver sever extension (south of route 28 . <br /> — Poppones,set Bay serer extension (south of route 28, south of Wi'llovvbend). <br /> In conjunction with their planning efforts, Barnstable to address portions of Cotuit peninsula. <br /> CO End of Phase compliance reporting consider updating MEP Model runs landuse and <br /> hydrodynamic models) and. MEP calibrate with water quality and benthic flue sampling as needed. <br /> 00 Coordinate with 208 flan and potentially run CCC MVP tool in conjunction with MEP Model runs <br /> to check on updated water data and possible adaptive management approaches. <br /> 00, Determine additional evaluations of existing wastewater treatment facilities leading into next <br /> phase of proposed improvements. <br /> 2027-2031 Phase 3 <br /> CO File [notices of Project Change and. DRI modifications as necessary to inform (and gain approval <br /> from) the environmentalreview process on the agreements and funding that will allover the next <br /> steps to proceed. <br /> 00 Shellfish propagation (continuation and future expansion). <br /> CO If shellfish propagation continues to lag or is not advancing as fast or to the levels anticipated: <br /> - Upgrade of Southport to improve nitrogen removal performance. <br /> - Site 4 facility expansion with sewer extension to serve Mashpee River and popponesset Bay <br /> Watershed Mlashpee (north of Route 2 with associated serer extensions. <br /> — Expansion of Willo rbend WWTF service area. <br /> — Site 6 facility development initially to serve Ockway Bay area. <br /> 8612001.4 Town of Ma hpee Sewer Commission ES-15 <br /> Final Recommended Flan I Final Environmental impact Report <br />