Laserfiche WebLink
N <br /> 6 <br /> a <br /> Now Seahury recharge facilities construction to support treated effluent from Mashpoo. <br /> Commons and Site 6„ <br /> Barnstable and Sandwich to begin provisions to address their remaining portions of the <br /> Popponesset Bay Watersheds. <br /> 00 End of Phase compliance reporting consider updating MEP Model runs landuse and <br /> hydrodynamic models)and MEP calibrate with water quality and henthic flux sampling as needed, <br /> Coordinate with 208 Plan and potentially.run CCC MVP tool in conjunction with MEP Moldel runs <br /> to check on updated water data and possible adaptive management approaches. <br /> CO Determine additional evaluations of existing wastewater treatment facilities leading into next <br /> phase of proposed improvements. <br /> 2032-2036: Phale <br /> Go Filo.Notices of Pr01 <br /> "ect Charge and DRI modifications as necessary)to inform (and gain approval <br /> from) the environmental review process on the agreements and funding that will allow the next <br /> steps to proceed. <br /> CO Upgrade of Cotuit Meadows and Warnpanoag Village to improve nitrogen removal performance <br /> (dependent on MEP modeling results and permit requirements). <br /> CO If shellfish propagation continues to lag or is not advancing as fast or to the levels anticipated: <br /> Site to serve l� <br /> facility,expansion with associated sever extensions <br /> amhlin/lehu Pond areas <br /> of lashpee. <br /> Collection system expansion to Site 6. <br /> -- Colle6tion system expansion on Great Neck Road North to l lashpee Commons. <br /> Collection system expansion for Hamblin and Jehu Pond Areas, upgrade/expansion of New <br /> Seahury WWTF <br /> co End of Phase compliance reporting—consider updating MEP Model runs landuse and <br /> hydrodynamic models) and MEP calibrate With grater quality and honthic flux sampling as needed. <br /> CO Coordinate with 208 Plan and potentially run CCC MVP tool in conjunction with MEP Model runs <br /> to check on updated water data and possible adaptive management approaches. <br /> CO Determine additional evaluations of existing wastewater treatment facilities leading into next <br /> phase of proposed improvements. <br /> 2037-20,41 Phase <br /> CO Filo Notices of Project Change and DRI l modifications as necessary) to inform (and gain approval <br /> from) the environmental review process on the agreements and funding, that will allow the next <br /> steps to proceed. <br /> CO If Shellfish propagation continues to lag or is not advancing as fast or to the levels anticipated: <br /> Remaining wastewater nitrogen from.. Barnstable (13-37 and parts of -3 and Sandwich <br /> Subareas (Sand-4, -5, and w-6) within the Popponses et Bay Watersheds will need to he <br /> 8612001.4 Town of Mashpee Sever Commission S-16 <br /> Final Recommended Plan/Final Environmental Impact Report <br />