My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/12/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
08/12/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 5:24:11 PM
Creation date
8/21/2019 9:51:02 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
08/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> 6 <br /> a <br /> Now Seahury recharge facilities construction to support treated effluent from Mashpoo. <br /> Commons and Site 6„ <br /> Barnstable and Sandwich to begin provisions to address their remaining portions of the <br /> Popponesset Bay Watersheds. <br /> 00 End of Phase compliance reporting consider updating MEP Model runs landuse and <br /> hydrodynamic models)and MEP calibrate with water quality and henthic flux sampling as needed, <br /> Coordinate with 208 Plan and potentially.run CCC MVP tool in conjunction with MEP Moldel runs <br /> to check on updated water data and possible adaptive management approaches. <br /> CO Determine additional evaluations of existing wastewater treatment facilities leading into next <br /> phase of proposed improvements. <br /> 2032-2036: Phale <br /> Go Filo.Notices of Pr01 <br /> "ect Charge and DRI modifications as necessary)to inform (and gain approval <br /> from) the environmental review process on the agreements and funding that will allow the next <br /> steps to proceed. <br /> CO Upgrade of Cotuit Meadows and Warnpanoag Village to improve nitrogen removal performance <br /> (dependent on MEP modeling results and permit requirements). <br /> CO If shellfish propagation continues to lag or is not advancing as fast or to the levels anticipated: <br /> Site to serve l� <br /> facility,expansion with associated sever extensions <br /> amhlin/lehu Pond areas <br /> of lashpee. <br /> Collection system expansion to Site 6. <br /> -- Colle6tion system expansion on Great Neck Road North to l lashpee Commons. <br /> Collection system expansion for Hamblin and Jehu Pond Areas, upgrade/expansion of New <br /> Seahury WWTF <br /> co End of Phase compliance reporting—consider updating MEP Model runs landuse and <br /> hydrodynamic models) and MEP calibrate With grater quality and honthic flux sampling as needed. <br /> CO Coordinate with 208 Plan and potentially run CCC MVP tool in conjunction with MEP Model runs <br /> to check on updated water data and possible adaptive management approaches. <br /> CO Determine additional evaluations of existing wastewater treatment facilities leading into next <br /> phase of proposed improvements. <br /> 2037-20,41 Phase <br /> CO Filo Notices of Project Change and DRI l modifications as necessary) to inform (and gain approval <br /> from) the environmental review process on the agreements and funding, that will allow the next <br /> steps to proceed. <br /> CO If Shellfish propagation continues to lag or is not advancing as fast or to the levels anticipated: <br /> Remaining wastewater nitrogen from.. Barnstable (13-37 and parts of -3 and Sandwich <br /> Subareas (Sand-4, -5, and w-6) within the Popponses et Bay Watersheds will need to he <br /> 8612001.4 Town of Mashpee Sever Commission S-16 <br /> Final Recommended Plan/Final Environmental Impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.