Laserfiche WebLink
removed outside of the watershed or treated to the levels required based on the MEP <br /> modeling results, <br /> Collection system expansion (blain Street route 301) Subarea T"to Site 4. <br /> Collection system expansion to ,Subareas A and C S000nsett and Monornosooy Islands). <br /> Collection system expansion to Childs diver watershed portion of Subarea H. <br /> 00 End of Phase compliance reporting consider updating MEP Model runs landuse and <br /> hydrodynamic models) and MEP calibrate with water quality and benthio flux sampling as needed. <br /> This schedule represents area possible future where the PPA is forced to implement traditional <br /> infrastructure to servo those areas outside of the Quashnet River Watershed where shellfish aquaculture <br /> is being pursued to reduce nitrogen loadings within the affected bays. Development of MOU's with <br /> neighboring towns will be necessary to establish a potential phasing strategy based on each town's <br /> specific needs. Towns may address other "neighborhoods" within the watersheds based on each <br /> individual town's planning efforts and approach. Monitoring and modeling efforts at the five-year intervals <br /> will be necessary to establish the extent of nitrogen removalfollowing shellfish aquaculture <br /> implementation. <br /> ES.8 Next Steps <br /> Clue to the long duration and complexity of this project as well as the inclusion of a number of different <br /> stakeholders who are critical to,the success of achieving the TMDLs, there are several items that gill need <br /> to be addressed following the submittal of the plan. This is a function of several different initiatives that are <br /> proceeding concurrently with this project, most notably: <br /> The ongoing 208 Planning Process going on through Barnstable County and the Cape Cod <br /> Commission. <br /> 00 Joint Base Cape Cod and Dass Development evaluations of the existing utilities (electrical', water, <br /> sewer, etc.)at the existing base and ownership discussions regarding these utilities. <br /> CO Town of Barnstable Nutrient Management Planning efforts Town-wide, as they are related to the <br /> portions of C otuit within the PPA. <br /> CO Town of Falmouth Comprehensive ''wastewater Management Planning efforts related to than <br /> "South Coast" embayrnents including Waguoit Bay. <br /> CO Town of Sandwich Comprehensive Planning efforts and future development projects being <br /> evaluated <br /> Commonwealth of Massachusetts planning efforts related to the use of, alternative approaches <br /> and technologies related to nutrient removal (primarily on Cape Cod, Southeastern <br /> Massachusetts, and BuzzardsBay). <br /> With this in mind, there are several key stops dooi, lons/dirootionas in wastewater and nitrogen <br /> management planning that will help in the completion of the Recommended Flan and its implementation <br /> over the next several decades. <br /> 8612001.4 Town of Mashpee Sewer Commission ES-1 7 <br /> Final Recommended Plan/Final Environmental Impact Report <br />