Laserfiche WebLink
i <br /> r <br /> co Scenario Fair Share reduction. <br /> co Scenario 5—Centralized treatment approach. <br /> Each of those scenarios was modeled through the Massachusetts Estuaries Project E program for <br /> both Popponossot Bay and Wa uoit Bays Feat. The findings were used in the development of options 1A, <br /> 1B, andC as, outlined in the 2012 Technical Memorandum presenting those options for addressing <br /> nitrogen in the watersheds. The ultimate goal of those new options was to advance the development of a <br /> Recommended Flan for nitrogen management within the FTA. Each option was modeled by the MEP to <br /> demonstrate feasibility to moot the T IDLs The results of those model runs were formally presented in the <br /> Final AFAR. <br /> The 2013 ASAR summarized the planning efforts performed to date, the model results and findings for the <br /> three proposed options I A, 1 B, and 1 Com), and the technologies screened as part of the 2007 Technology <br /> Screening Deport). This document also summarized the framework for the Recommended Plan and <br /> identified the general categories of nitrogen removal that would be used to form the basis of the <br /> Recommended Felon. <br /> The ASAI.identified these main categories to address nitrogen r+emovel. <br /> 00 Source removal. <br /> Go Direct Environmental Mitigation. <br /> 00 Land management Strategies. <br /> Using these categories the ASAR outlined a framework for the development of the Recommended Plan,. <br /> The 2014 Draft recommended Flan built upon this effort and evaluated alternatives to the option I A plan, <br /> including: <br /> 00 Centralized vs.. new cluster area treatment facilities <br /> co Regional Solutions <br /> co Existing Wastewater Treatment Facilities WWTFs <br /> co Traditional vs, Hybrid Solutions <br /> — Primarily.- <br /> o Shellfish Aquaculture <br /> — Secondarily: <br /> Permeable reactive Barrier,(PRB) <br /> Bog and Wetland restoration <br /> Onsite systems <br /> The evaluations and draft recommended plain are included in Chapters 4 and 5 of this report. <br /> 86120 1.4 Town of Mashpee Seaver Commission ES-4 <br /> . Pinel Recommended flan/Final Environmental Impact Report <br />