My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/12/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
08/12/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 5:24:11 PM
Creation date
8/21/2019 9:51:02 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
08/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Wastewater Treatment at Joint Base Cape Cod ,S CC : <br /> a. Potential expansion: <br /> i. Mashpee Subareas H (including High School), L, and M. <br /> ii, Sandwich Subareas,Sand-1, -2, and-3 <br /> lei. No change to open sand beds. <br /> iv. Future consideration (potential WWTF additional expansion),-, <br /> a) Falmouth areas Fal-13 to Fal-17 (poten,tiallyto be recharged outside watershed). <br /> b No change to open sand beds. <br /> b. Expansion of the existing Carrousel@ WW TF to add another parallel train of equal size and an <br /> additional second clarifier. <br /> 3. Wastewater Treatment at Proposed New Facilities: <br /> a. Site 4 to serve Subareas: F, S1, S,2, and T: <br /> i. Phased to pick up portions of S adjacent to Falmouth Road fiat. <br /> ii.. Recharge at Site 4. <br /> %%i.. Fallback, recharge area at Willow bend Golf Course. <br /> iv. Treatmentperformance dependent on recharge location <br /> b. Back Road Site as a backup to J CC (see 2), <br /> i. Sand-1, Sand-2, and Sand-3 would need to be addressed in heir watersheds and <br /> recharged outside the watershed, or possibly connect to a regional facility at Back Road. <br /> o. Site 6 to serve Subareas identified under,shellfish propagation (exceptSubarea B :: <br /> i. Later year project as shellfish performance is monitored. <br /> 4, Wastewater Treatment at Existing WWTFs with lmprove rnents/Expansionsll od fioetion . <br /> a. New Seabury- expand recharge capacity, potential future expansion of Subarea B (as <br /> fallback to shellfish),.- <br /> i. <br /> hellfish ,:i. Potential expanded recharge capacity from other treatment locations (Mashpee <br /> Commons, Windohime I Point and Site drip, irrigation in addition to existing recharge <br /> capacity at Site 7 and golf course areas. <br /> ii. No initial expansion needed until new facilities are constructed at Site 6 or modeling <br /> shows shellfish program will not meet TM Ls with continued recharge from Mashpee <br /> Commons and Windohime Point. <br /> b�. villowbend expand recharge capacity, as fallback for Site 4 WWTF, improved future <br /> performance to 3 mg/L TN: <br /> i. Potential expanded recharge capacity(drip irrigation). <br /> ii. Potential extensions of service to pick up Subarea 1, <br /> iii. Evaluate.performance needs in conjunction with shellfish results. <br /> o. Mashpee Commons: <br /> %. Potential expansion to Subarea P (and N as required). <br /> ii. Recharge locally under shellfish program. <br /> 8612001.4 Town of Mashpee Serer Commission ES-6 <br /> Final Recommended Flan/Final Environmental Impact Deport <br />
The URL can be used to link to this page
Your browser does not support the video tag.