Laserfiche WebLink
MINUTES March 26, 1992 4 BOARD of HEALTH <br /> system is operable it is to be tested from inside the dwell- <br /> ing to ensure the vert is functioning properly- and the engi- <br /> neer shall submit in writing a contingency plan for pumping <br /> the system. "Plan approval is conditional upon the engineer <br /> submitting revised plans indicating the above mentioned re- <br /> quirements. " <br /> A P IIT E T: Bob Govoni -- Mashpee Little League <br /> Mr. Govoni was in attendance for this scheduled appoint- <br /> ment. <br /> Mr. Govoni informed the Board the Kittle League is pro- <br /> posing to expand the concession stand however, the addition <br /> will not be completed until next year. " "No seating is pro- <br /> posed for the interior of the building, " <br /> Mr. McQuaid informed Mr. Govoni he will be required to <br /> install one bathroom for each sex. <br /> Mr. Govoni stated he is proposing the installation of <br /> hard sink. <br /> Mr. McQuaid informed Mr. Govoni the handsink must have <br /> hot and cold running water, <br /> Mr. Govoni stated this season he will limit the sale of <br /> food items to hot dogs, soda and packaged snacks, "There <br /> will be noon-site food preparation. " <br /> Mr. G `ee l i sh motioned to grant a 1992 temporary food <br /> service permit to the organization known as the "Mashpee <br /> Little League' and waive the fee requirement, with the <br /> stipulation ,% a viand sink with hot .and cold running water is <br /> installed Fwithin the confines of the "building r Mr,. Costa sec- <br /> onded, all. agreed. <br /> . Letter from P C.C. Commission to .N.G. re: Base land <br /> lease .W.T. - Mr, Greelish '~stated the wise has `ecog- <br /> ni ed the need and will follow through with their commitment <br /> with the towns of Mashpee ,,,and Sandwich. <br /> . ) variance re ue ts: 105 West-Way and 19 Vest <br /> 10West Way - Mr, McQuaid informed the Board this is a <br /> preapproved subdivision however, there is o master plan on <br /> file. "In my opinion the engineer has proposed the most fea- <br /> sible locations for the well and leaching facility. " "The <br /> necessary variances are as follows* a 301 variance from the <br /> abutting leaching .facility, lot 50) . to on-site weld. , a 51 <br />