My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/25/1992 BOARD OF HEALTH Minutes
>
6/25/1992 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 5:07:39 PM
Creation date
8/22/2019 3:28:20 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
06/25/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
l <br /> MINUTES June 25, 1992 5 BOARD ALTH <br /> + .2 <br /> r - - <br /> V <br /> F <br /> Mr. Greelish stated he will attend the meeting. <br /> . Eimer enc Rena Certiictin r - d ater Road Mr, Evans stated he inspected the -site 'and authorized mmedi <br /> ate repair as there was sewerage on the ground surface. IlAs <br /> of yet, plans have not been ,submitted.. ;- <br /> F , <br /> Mr. Doherty motioned to grant the emergency repair with <br /> the stipulation plans meet the Health Agents approval , Mr, <br /> Ball seconded, all agreed. <br /> Bard members forwarded their signatures to the - "Emer- <br /> gency <br /> Emer- <br /> en y Repair Certification" form. <br /> . Notice of Civ. Defense Director vacAcknowledged <br /> t <br /> *****NEW B SINESS * <br /> Lot 1 Valerie Circle <br /> Mr. McQuaid informed the Board this is a preexisting <br /> lot, "Variances are required from on-site well to on-site <br /> leaching facility, abutting well to on-site leaching facility <br /> and on-site well to abuttingseptic. " <br /> F <br /> Mr. Doherty motioned to grant a 291 local variance from <br /> on-site well to abutting leaching facility, lot 13) . a 201 <br /> Local variance from on-site leaching facility to abutting <br /> well , lot 15) . a 61 local variance from on-site leachingfa- <br /> cility to abutting well, (lot 1 and a 31' variance from <br /> on-site well to on-site leaching facility, Ir. Ball seconded, <br /> all agreed. <br /> Re nest for purchase of Jersev.. Barriers <br /> Mr, Doherty stepped down from this mutter as he found it <br /> to be a conflict of interest. <br /> Mr. McQuaid informed the Board Mr, DiMaggio is reguest- <br />
The URL can be used to link to this page
Your browser does not support the video tag.