My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/04/2019 DESIGN REVIEW COMMITTEE Minutes
>
06/04/2019 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2019 5:01:27 PM
Creation date
10/15/2019 11:57:07 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/04/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minutes of Meeting of <br /> Design Review Committee <br /> Held Tuesday, June 4, 2019 <br /> Mashpee Town Hall Popponesset Meeting Room <br /> Charlie asked if there will be any illumination for the sign. Mr. Morin thought maybe <br /> solar. Charlie said you have to be careful with neighbors regarding light spillage. <br /> Street signs whether on public or private property are under the DPW <br /> requirements. <br /> Miles reviewed the printout of the Ockway Highlands sign, and thought the color <br /> did not depict the navy color as mentioned. He thought the design within the sign <br /> was not centered. He asked what materials would be used for construction. Mr. <br /> Morin said it's a 2 inch quarter wooden board; the white lettering is routed and <br /> painted. The background of the water, ship, and sand is actual real sand blown <br /> into the sign, and painted. It's a two-sided sign. <br /> Motion; <br /> Jonathan made a motion to accept the project as presented with the following <br /> suggestions; <br /> • The Developer shall consult with Catherine Laurent, DPW Director for the <br /> location of the street signs for Blue Castle Drive and Carriage Road. <br /> • The Developer shall receive permission from the Selectmen for the Ockway <br /> Development sign, and consult with Catherine Laurent, DPW to discuss the <br /> setback requirement for pedestrian traffic, and the street noting (§174-54 <br /> (B). <br /> • The design of the Ockway Highland sign to be symmetrically centered on <br /> both sides. <br /> • The Developer must discuss any illumination of the sign with the Building <br /> Department. <br /> The Developer must ensure that the homeowner's association adhere to <br /> the maintenance of the sign in perpetuity as in the bylaw §174-53. <br /> Joe Cummings second. Jonathan approved, Miles opposed. The sign passed with <br /> a 2-1 vote. <br /> Business name: Four Square Development, LLC <br /> Project Address: 31 Mercantile Way <br /> Owner/Agent: Four Square Development, LLC <br /> Representative: Attorney, Kevin Kirrane <br /> Arch itect/Engineer:. Down Cape Engineering/Giampietro Architects <br /> Requests: 9,972 sq. ft. Industrial Building, Contractor Bays. <br /> Dan O'jala, with Down Cape Engineering represented the request for the project. <br /> The site is in the industrial zone, and the building is consistent with the other <br /> buildings in the area. The entrance to the lot will be on the west side, and is a big <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.