My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/02/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
12/02/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 10:23:19 AM
Creation date
12/6/2019 10:01:22 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
12/02/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qCDRAFT* BOARD OF SELECTMEN MINUTE OVEMBER 18, 2019 6 <br /> Board of Selectmen <br /> Minutes <br /> November 18, 2019 <br /> APPOINTMENTS & HEA11INGS <br /> Presentations on.'Staffing Wastewater Treatment :facilities"PL Tow n Staff or Contract operators; Case <br /> Studies of Falmouth and Chatham. Presenters: <br /> RayJa,ck, Falmouth DPW Director: (continued)' <br /> The $1.5 million budget supports $630,000 in salary and overtime wages for 8 operators., The plant <br /> services 2,300 accounts at a cost of$26 per year, treating 8 in. gpy of septage. There are I I lift stations <br /> and 37 miles of mains C 13 miles of force mains) within this, system. A secondary smaller plant is situated <br /> in.the New Silver Beach area in the vicinity of the North Falmouth School, and treats 13k gpd. <br /> Mr. Jack 'indicated there is no debt service on the wastewater system. It is 100% rate covered, 'Including <br /> maintenance. Utilizing an Enterprise F und, water and sewer expenses are shared. Operational costs do not <br /> cycle on the levy. <br /> The Town of Falmouth manages all operations of the facility. There are no'contract operations. Capital <br /> expenses have a debt return on principal and interest. Betterments are an option. The allocation is <br /> generally 70% homeowner and 30%town. When considering betterments, and SEU's Mr. Jack <br /> recommended defining what is included and what is not 'included, and to determine what system is fair and <br /> not necessarily challenged. Falmouth processes septage at a lower than marketr'ate maintaining this <br /> service for the Town of Falmouth only. <br /> When considering overall funding, the town would need to make the decision to fund by the sewer rate to <br /> incur the debt service of the tax rate. It was noted the Long pond facility was funded 1/2from the tax rate <br /> and 1/2from the facility. The original construction cost was $40 m. There were 12 change orders, some of <br /> which were credited 'increasing the dud getiust under $2 ! , + . Mr. Jack indicated that change orders <br /> become necessary with less preparation. It was recommended the town spend a significant amount of <br /> review on the design provision and allocate a contingency of 1.5% to the overall cost. <br /> It is important to have the participating community buy-into the project for support. In the Town of <br /> Falmouth a committee having technical skills with respect to design review was established, and costs were <br /> presented to the voters. It was recommended that a strong project team "initiate discussions with DEP and <br /> make the extra effort on supervisory control to maintain budget projections. <br /> Dr. Robert Duncanson, Chatham Director of Health and Natural Resources.-, <br /> In the Town' of Chatham a committee was developed of citizens, the business community and others <br /> representing all of the geographic areas of*town to review all scenarios and to educate the public. With an <br /> existing wastewater collection system and sewer treatment plant,, the project plan was facilities driven. In <br /> 0. <br /> considering scenarios cons and the environment as a primary factor, it was determined the town would sewer <br /> phase I and phase 11, the 'immediate area in the downtown core of Chatham. It is the intention of C hatham <br /> to sewer 1100% of the town. There is 20 years remaining in the overall plan. <br /> Dr. Robert Duncanson, Chatham Director of Health &Natural Resources indicated the oxidation ditch or <br /> carrousel process is used in the $15o m. plant collection system Which is comprised of 14 pumping <br /> stations. With water mains, gas mains and utilities, the project is disruptive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.