My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/7/2004 PLAN REVIEW COMMITTEE MINUTES Minutes
>
7/7/2004 PLAN REVIEW COMMITTEE MINUTES Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 11:36:59 AM
Creation date
12/6/2019 11:36:57 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLAN REVIEW COMMITTEE MINUTES
Meeting Document Type
Minutes
Meeting Date
07/07/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br /> Minutes <br /> Site Plan Review <br /> Wednesday, July 7, 2004 <br /> Present: Jim Marr, Tom Fudala, Eric Smith, George Baker, Glenn Harrington, Russ <br /> Wheeler, Catherine Laurent and Pat White <br /> Projects under Review <br /> Cape Cod Counter Works <br /> 759 Falmouth Road <br /> Applicant, Kevin Cayer <br /> Engineer, John Slavinsky <br /> The building is 7, 488 square feet on a 93,568 square foot lot, with 20 parking spaces. <br /> Cape Cod Counter Works makes counter tops. <br /> Mr. Cayer intends to mill counter tops, laminate,wood, corrian, and granite. Will have a <br /> small display room, some outside storage, and no other tenants. <br /> Tom Fudala would have them check on wastewater and The Cape Cod Commission. <br /> Fire Dept asked what the hazard class was. All applicants must know the use group that <br /> they fall under. <br /> Fire lanes on three sides of the building. <br /> Fire protection was discussed. <br /> There are two installation trucks on the property. <br /> Drainage was discussed in detail. <br /> Design Review for signage, building and landscaping are required. <br /> Board of Appeals Special Permit required. <br /> Clover Paving, Co., Inc. <br /> 78 Industrial Drive <br /> Applicant, Michael Borselli <br /> The building contains 9,750 square feet and will be divided into contractor bays with <br /> office space. Offices in the front and access garage doors in the rear. There are 18 <br /> parking spaces provided in the rear and front of the building. <br /> The building will be constructed across from Madaket Place. <br /> Tom had concerns about the drainage, drawings shows pipe to catch basin under the <br /> grass. The catch basins will be cleaned and maintained. <br />
The URL can be used to link to this page
Your browser does not support the video tag.