Laserfiche WebLink
SITE PLAN REVIEW MEETING MINUTES <br /> NOVEMBER 12, 2004 <br /> PRESENT: Glenn Harrington, Catherine Laurent, Pat White, Eric Smith, George <br /> Baker, Jim Marr. <br /> Opened 10:00 a.m. <br /> Projects Under Review: <br /> 588 Main Street <br /> Map 19/Parcel 10 <br /> Owner - ABKJJT <br /> Applicant - Stephen Giatrelis <br /> Engineer - Cape & Islands Engineering <br /> Attorney - Kevin Kirrane <br /> Property zoned C-3 and 1-1 <br /> Stephen Giatrelis presented a subdivision plan for the 48 acre property dividing it <br /> into 16 lots. The project will include one 6-acre lot for residential development, <br /> 10 lots for commercial-industrial uses, specifically, contractor buildings and <br /> storage, and two lots on Route 130 for commercial/office uses. For planning <br /> purposes, a restaurant and a 4-unit office/medical building are proposed on each <br /> of the latter two lots. A 6-acre lot is also proposed for passive/active Recreation <br /> for the residential development and 18 acres are proposed as open space. <br /> George Baker suggested specifying the use for each of the proposed <br /> commercial/industrial buildings since building code requirements vary depending <br /> on the proposed use. The use must be known for review and approval of any <br /> building permit. Stephen G. expressed a preference for a general classification <br /> at this time. George Baker suggested designating a Road name. There is <br /> concern re: water flow. There are problems on Nicoletta's Way with getting <br /> adequate flow. Looping the water main with Echo Road should be considered; it <br /> will probably be required by the Water Department. An easement from the owner <br /> of the adjacent property on Echo Road will be needed in order to provide <br /> emergency access and/or utilities to Echo Road. The Applicant is seeking a <br /> Development Agreement, which is a three party agreement between the <br /> applicant, the Town, and the Cape Cod Commission. The Cape Cod <br /> Commission requires the Applicant to set aside 66% of the total land area for <br /> open space. The Applicant proposes to develop the residential lot through the <br /> Chapter 40B process. Five 3-story buildings with 24 units each are proposed for <br /> a total of 120 units which is a higher density than allowed by zoning. A sewage <br /> treatment plant would be constructed when they begin the 3' building. A <br /> suggestion was made to work the cul de sac into parking like the senior center. <br /> Use of traffic calming measures on the proposed road, other than speed bumps <br /> was suggested to slow traffic. Because the project involves the subdivision of <br />