Laserfiche WebLink
MASHFEE SEWER COMMISSION <br /> TUESDAY9 FEBRUARY 11, 199 <br /> Tomes <br /> Present: Dennis Balzafini, Brad Caf'fyn,Toni Fudala <br /> Meeting convened at 7:0 p.m <br /> NUENUTES <br /> Dennis made a motion to accept the minutes of January 21, 199 7 as written. Brad <br /> seconded the motion. All members were in favor .o.** <br /> Torn spoke with Doug Storrs of 1 lashpee Commons about touring their plant. He said he would <br /> ask their consultant to call Tom but he has not yet heard from thern. <br /> Toni did spew with willowbend about touring their plant and scheduled a tour for tonight at <br /> ; o p.m. They have an RBC type plant(rotary biological contactor), as does Mashpee <br /> Commons. <br /> d Pasqua, an engineer who works for Willowbend will be conducting the tour. <br /> Most of the plants in town are run by contractors- firms with licensed operators. <br /> Tom ran across an add by Earth Tech,the firm which did the groundwater model for the water <br /> District. They are advertising their total water management program services. Torn read the add <br /> for the members. <br /> If the Sewer Commission were to acquire any plants in town,they would most likely hire a firm <br /> similar to this one to deal with the whole operation. The town would not need a lame <br /> infrastructure to manage the system. <br /> Brad said with any subcontractors we should have a system set up to do random audits. It makes <br /> the fins accountable for what they are doing. <br /> Dennis asked who would set the rate structure? <br /> Torn said the Sewer Commission would, with recommendations from the consulting firm. <br /> Dennis said we would need enough people hooked up to make it workable. <br /> Tom said that is the beauty of taking over an existing plant. <br /> Brad said he is still working on getting the Weston and Sampson report from the Board of <br /> Health. <br /> i <br /> Torn did not yet get a copy of Barnstable's phase IIf report but he will continue to try. <br /> At 7: o the Sewer Commission left town hall to tour the Willowbend Sewage Treatment plant. <br /> d Pas qua from willow bend met the Commission members at the plant. <br /> e explained the operation of the plant to the members. They have 4 pump stations. with <br />