Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> NOVEMBER 13,2019 <br /> Chairman Furbush wanted confirmation on the amount of bedrooms. Tom Bunker <br /> explained that the existing house has four bedrooms. The new house will have three <br /> bedrooms, but the new septic system will allow for a fourth bedroom if the owner decides <br /> to install a bedroom above the garage in the future. <br /> Sharon read the Board of Health comments into the record. Jonathan read the Conservation <br /> Comments into the record. <br /> Attorney Brian Wall and Arlene Wilson,with A.M. Wilson and Associates. Together they <br /> represented the abutters of the property on Jeep Place. Mr. Wall said that the abutters are <br /> not against the project, but they have some concerns of the affect the project will have on <br /> drainage. He mentioned that his client has observed in storm events water puddling in front <br /> of the garage, and any storm surges and storm events that come up over the property and <br /> onto the road. <br /> Mr. Wall would like to discuss the requests for the variances, and the maximum lot <br /> coverage.He mentioned M.G.L. c. 131 Section 40,the Massachusetts Wetlands Protection <br /> Act may not be counted when calculating the lot size for purposes of maximum lot <br /> coverage.As mentioned in the presentation there are several wetland areas on this property <br /> including beach, dune, bank, and land subject to coastal storm flowage. He said that the <br /> garage and the land on the entire lot is subject to coastal storm flowage. He believes that <br /> the calculations appear that these areas are not supposed to be counted were in fact counted <br /> and in fact land subject to storm flowage. He asked the Board to be certain that the <br /> calculations are in accordance with the bylaw and that the project does comply with lot <br /> coverage requirements. He believes that the proposed project will increase those non- <br /> conformities,especially the new structure within the area of the setbacks. He said that the, <br /> existing dwelling complies with setbacks as far as the dune is concerned because the <br /> existing dwelling is more than 50 ft. away,but the new dwelling will be within the setback, <br /> to the dune, and that is anew non-conformity with regard to Section 174-33. He believes <br /> that the project requires two Variances for the garage and the house. <br /> Arlene Wilson, with A.M. Wilson and Associates specializes in shore front matters. She <br /> provided the Board with a copy of the BSS site plan depicting the land subject to coastal <br /> storm flowage(known as the 100 year floodplain). She estimated that upland area is 12,100 <br /> sq. ft., and based on the site coverage numbers from the applicant that would result in a lot <br /> coverage of about 33%. So she believes that those lot coverages should be reviewed. She <br /> pointed out that this particular area it is common for the coastal bank to wrap around the <br /> high and low knolls. The seawall does not negate the coastal bank function because it's not <br /> high enough. The top of the seawall is lower than the elevation of the 100 year flood. The <br /> unprotected section of the bank still provides protection for areas that are further landward <br /> in the event of higher flooding. <br /> 5 <br />