My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/13/2019 ZONING BOARD OF APPEALS Minutes
>
11/13/2019 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 10:52:39 AM
Creation date
5/1/2020 10:38:45 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
11/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> NOVEMBER 13,2019 <br /> In terms of flood impact concerns of the proposed garage; the area is depressed and will <br /> fill up with water from the ocean in coastal storm events. The concrete seawall and the <br /> stone revetment that wraps around as well as the berm on the beach tends to hold water <br /> longer than the rest of the area. It takes drainage not only from this lot but from the abutting <br /> neighborhood areas.Arlene said there were interesting discussions with Concom regarding <br /> deficiencies in the flood impact wetlands regulations; there is no design criteria for land <br /> subject to flooding. So the Conservation Commission can look at whether a building is <br /> going to stand up during a flood event. They do not have the ability to impose conditions <br /> that will ensure that construction in floodplain doesn't really impact other abutters. So <br /> impacts to the neighborhoods are left to the Boards like the ZBA when a project needs <br /> review. <br /> Jonathan asked Arlene if she made the same presentation at the Concom meeting. She said; <br /> yes,but there was very little they can do. They did not receive drainage calculations. They <br /> were insured that the drainage that developed on this lot from the new structures will be <br /> handled by the dry wells, and proposed drainage structures, but there was very little input <br /> given to what would happen in the neighborhood. <br /> Jonathan said that he was surprised that Concom was not more concerned but in fact they <br /> did grant this project. Arlene said that DEP has been working on regulations for about four <br /> years now and when some political issues arise after public comment the DEP comes to a <br /> halt. There are no design criteria for work in land subject to flooding. Jonathan said that <br /> would be up to the Building Commissioner and the Building Inspector. <br /> Mr. Wall said that the presentation made to Concom was within their jurisdiction, but for <br /> other wetland resources such as bordering vegetative wetlands,river fronts,and dunes there <br /> are guidelines called performance standards. All wetlands regulations have performance <br /> standards, but land subject to coastal storm flowage has none. There's no criteria to apply <br /> with regard to effects off the property of neighborhoods,and he said that under the bylaws, <br /> the.ZBA does have this under their Special Permit criteria. <br /> The Board wanted confirmation regarding the current situations with storm drainage. Tom <br /> Bunker addressed the questions and pointed out the contour of the area on the plan showing <br /> the elevations ranging between 8 to '10 near the dune, and said the lowest location might <br /> puddle. The proposed garage will not be affected by storm water because it is outside the <br /> limit of the work. There are dry wells below the garage floor and it will have flood vents. <br /> Tom said that Lot 7A is lower than the existing ground now, and the existing driveway. <br /> The driveway will prevent water from flowing onto Lot 7A and there's a trench drain along <br /> the west side of the driveway and is piped back toward the road. No water that goes into <br /> the area of the garage could possibly go onto Lot 7A because the dry wells will prevent <br /> that from happening. <br /> 6 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.