Laserfiche WebLink
Minutes of Meeting of <br /> Mashpee Plan Review Committee <br /> Tuesday, December 17, 2019 <br /> The gravel surface parking area will be paved. The boat wash pad will be installed <br /> with a water recycling component to accommodate the washing of boats. The <br /> elevation plans show the same dimensions as the existing building. There is more <br /> than adequate parking. The boats are gone during the summer months, and <br /> brought back during the fall and winter. Folks have the ability to work on their boats <br /> inside the facility..There's nothing changing with the drainage system. There may <br /> be an increase in capacity with.the additional pavement and run-off from the roof. <br /> It's basically a mirror image of the existing building. The site is well maintained and <br /> clean. <br /> Scott Carline had no comments. <br /> Evan Lehrer commented that the project is an existing use on a property.that has <br /> boat storage, and there is an additional building proposed with the same use. He . <br /> had no further comments. <br /> Charlie asked if there will be a tight tank in each unit. Dan Ojala said there will be <br /> overhead doors with a floor drain. They are piping the system together with the <br /> other building.because it's an underutilized floor drain with an alarm. He said he <br /> will work with Glen;and there's'a one-time DEP permit. Any washing outside with <br /> the closed loop system does not discharge into the environment. The parking lot <br /> will be paved with drainage basins and man'holes that will discharge toward the <br /> grass lined retention area. If that fills up it overflows into a subsurface and will <br /> handle a 100 year event. <br /> Tom Rullo commented that the building will be sprinkled. He asked about the attic <br /> space. Joao said there will be a dry system in the attic.The alarm system will have <br /> the same as the existing building. The street address will need to be revised for <br /> each building. Charlie asked if there will be enough access around the building. <br /> Tom said there is plenty of room for his apparatus. <br /> Evan moved to recommend approval. Scott second. All were in favor. <br /> Business Name: Shoestring Bay Nominee Trust <br /> Proiect Address: 21 Frog Pond Close <br /> Agent: Attorney Kevin Kirrane <br /> Engineer: Cape & Islands Engineering <br /> Request: Applicant is proposing an additional 79 slips to the Marina, and <br /> replace and relocate a 12' x 24' shed with a 20' x 20' shed and boardwalk. <br /> Alteration/Change is a pre-existing non-conforming use. <br /> Attorney Kevin Kirrane represents Tim Leedham, Owner of Mashpee Neck Marina. <br /> Also present was Matt Costa with Cape & Islands Engineering. There's an . <br /> application with the ZBA to.request' an increase of the parking for the number of <br /> boats slips on the site, and demonstrate that there is adequate parking. The use <br /> is.conforming, but the use of the parking area is a non-conforming use. <br /> 2 <br />