Laserfiche WebLink
Town of Nlashpee <br /> o, <br /> 16 Great,Meek &oad hVorth <br /> Alaslipee,Nassochusetts 0,2649 <br /> `�Alilf�V' <br /> Minutes of Meeting <br /> Mashpee Plan Review Committee <br /> Tuesday, January 21, 2020 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Plan Review Members Present: <br /> Charlie Maintanis, Building Inspector <br /> Katelyn Cadoret, Assistant Conservation Agent <br /> Glen Harrington, Board of Health Agent <br /> Caitlin Gardipe, Assistant Board of Health Agent <br /> Evan Lehrer, Town Planner <br /> Rodney Collins, Town Manager <br /> Tom Rullo, Fire Chief <br /> Charlie called the meeting to order at 9:35 am. The Committee Members introduced <br /> themselves. <br /> 9:35 AM Project Address: 29 Seconsett Point Road <br /> Owners: William and Kathleen Humphrey <br /> Representative: Michael O'Shaughnessy, Esq. <br /> Architect/Engineer: Falmouth Engineering <br /> Request: Owner proposes to raze and replace an existing single <br /> family residence, and construct a detached two-car garage with <br /> office space and bathroom above for home office use. <br /> Attorney, Mike O'Shaughnessy represented the applicants for the raze and replace of their <br /> single family dwelling, and adding a two-car detached garage. The Attorney provided the <br /> plans of the existing conditions, and proposed site plans of the property. The reason for <br /> the Plan Review meeting is because the owners are proposing to use the space above the <br /> garage as an office. The homeowner is a builder, and would like to have his business at <br /> the Cape. The Zoning bylaw requires a Plan Review, and the raze and replace will be <br /> presented to the ZBA. <br /> Katelyn Cadoret <br /> This project was at the Conservation Commission on December 12,2019,there were some <br /> minor issues that were addressed and most of the regulations have been met. The <br /> driveway will be pervious material because the parcel is in a flood plain. The natural <br /> vegetative areas have also met the criteria. This project is meeting again on Thursday, <br /> January 23. There were no other issues. <br /> Glen Harrington <br /> There arp three bedrooms proposed in the main house. The septic is built for four <br /> bedrooms. Glen wanted to know if there is access to the garage behind the office, Mr. <br /> O'Shaughnessy said that the wall just goes straight up to separate the rest of the office <br /> space. Glen wanted to know if the space above the office will be finished. Mr. <br /> O'Shaughnessy said; no.The space above will be unfinished and unheated. Glen said that <br /> the septie:'system wasn't shown on the site plan. <br /> 1 <br />