My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/16/2020 DESIGN REVIEW COMMITTEE Minutes
>
6/16/2020 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2020 11:47:55 AM
Creation date
8/26/2020 11:47:38 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Allashpee <br /> 16 Great JNreck&ad„N`orth <br /> �lashpec,lYlrass�uchar5etts t)2f4.) <br /> Minutes of Meeting <br /> Design Review Committee <br /> Tuesday,June 16,2020 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Design Review Committee Members Present: Charlie Maintanis,Jonathan Furbush,Joe <br /> Callahan, and Miles Peters. <br /> Charlie opened the zoom meeting at 8:39 AM (remote/virtual). <br /> 8:39 am Project Address: 100 Willowbend Drive <br /> Business Name: Southworth Cape Development, Inc. <br /> Agent: John Lavelle, Baxter Nye Engineering& Surveying <br /> Request: Clubhouse Villas at Willowbend, 1-6 Unit Condos.Proposed with <br /> parking and utility infrastructure improvements, 4,786 sq. ft. <br /> footprint/19,150 sf. Including basement and 3 floors. <br /> Planning Board: Special Permit Modification. <br /> John Lavelle represented the application to construct six (6) villa style townhouse units; <br /> three (3) floors with basements. It will be situated on a one acre lot which was subdivided <br /> back in 2014 from the main 240 acre parcel at Willowbend. This lot is 40,009 sq. ft. It has <br /> 168 ft. of frontage on Quinaquisset Avenue, and the requirement is 150 ft. The site is <br /> surrounded by the golf course to the west, north, and east side with Quinaquisset Ave. to <br /> the south. <br /> There will be an asphalt parking lot with two parking spaces per unit. The storm water <br /> management system will be constructed to handle the run off from the added impervious <br /> areas. The storm water will also directly infiltrate all the loose drainage from the new <br /> building.The project building will fall within the 50 ft. of the cranberry bog. The owner of <br /> the bog is Southworth Properties LLC and they agreed not to farm the cranberry bog that's <br /> within the 150 ft. and let it naturalize. The site is zoned in the R-3 District which allows <br /> the proposed use. Willowbend is under the Planning Board Special Permit. There will be <br /> new water service directly from the water main off Quinaquisset Ave. with underground <br /> utilities. There will be 400 ft. of 8" sewer installed sent to the wastewater treatment plant <br /> at Willowbend. The lot coverage is 12%. There will be sidewalks in front of the building <br /> for pedestrian access. The drainage system has been designed to meet Town zoning <br /> ordinances and DEP requirements. The site is generally flat, grading will be minimal, and <br /> filtration control will be installed and maintained during construction to keep any potential <br /> sediments running into the wetlands or bog. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.