My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/15/2010 SEWER COMMISSION Minutes
>
6/15/2010 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 2:00:37 PM
Creation date
10/2/2020 2:00:30 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Site Visit by members of the Sewer Commission on June 10, 2010. <br /> Present: (Please sign in) <br /> The meeting convened at 4:35 PM at the clubhouse on the Wind Chime property. <br /> Several of the trustees of the condo association met us and after a brief introduction <br /> accompanied us to the on-site waste water treatment facility. <br /> The original septic system was retrofitted by an Amphidrome system which was adjusted <br /> to meet the existing field conditions. The available construction plans only indicate the <br /> mechanical system parts. No subsoil exploration data was given. <br /> The part-time technician explained the many variables which are recorded on computer <br /> print-outs. <br /> The original wastewater collection system conveyed all sewage generated by more than a <br /> hundred units to the location which appears to be the geographic low point of the area <br /> and is located close to Mashpee River. <br /> A series of ground water test wells have been installed surrounding the leaching facility <br /> which are located primarily down gradient of the soil absorption system and the westerly <br /> bank of Mashpee River. <br /> The operating cost per year is approximately$100,000 <br /> It appears that the test data recorded by computerized system does not comply with some <br /> of the test results obtained by samples retrieved from the ground water test wells. <br /> It is claimed(assumed)that the subsoil confluence of treated effluent from an adjoining <br /> waste water treatment facility which serves the Mashpee Commons etc. might account <br /> for the discrepancies. <br /> The initial conclusion is that the existing system serving Wind Chime Development is not <br /> suited to treat additional volume of sewage. <br /> Visit to Mashpee Commons Waste Water Treatment Facility. <br /> At approximately 5 PM the remaining commissioners were met by representatives of the <br /> Owners of Mashpee Commons. <br /> The waste water treatment plant is a duplex RBC type system which is one of the <br /> simplest technologies developed for clarifying sewage. <br /> Unlike the system for Wind Chime which major parts are buried below grade; the <br /> mechanical apparatus of the RBC system is housed in a climate controlled building. <br /> ply' Y <br /> Raw sewage is pumped from several commercial, residential and town government <br /> buildings which after passing through settling tank end up in a flow equalizing tank from <br /> which a measured constant flow of sewage flows into the RBC treatment units. <br /> The treated effluent is UV treated and also injected by Methanol to aid in de-nitrification. <br /> The clear effluent is dosed over an open leaching bed which is located in a fenced—in <br /> area and maintained to be free of biological growth. <br /> It was learned that the facility has additional capacity both for treatment and ground <br /> water disposal. <br />