Laserfiche WebLink
Russell Kleekamp <br /> July 31,2005 <br /> Please note that our budget estimates include only the costs for the major <br /> vacuum system components. The budget estimate does not include items such <br /> as force main, final surface restoration, road borings, building hookups and other <br /> incidental costs. Nor does it include project costs such as engineering, R-O-W, <br /> legal,etc. <br /> Again, thank you for allowing us to evaluate the project area. If there is any <br /> additional technical information you would like,please do not hesitate to call. <br /> Sincerely, <br /> -AY'"n <br /> Sean Agans,El <br /> Project Engineer <br /> _ Copy: AIRVAC—Tampa <br /> AIRVAC—Rochester <br /> Sustainable Resources Group-_Jim Sweeney <br /> 2 <br />