Laserfiche WebLink
*DRAFT BOARD OF SELECTMEN MINUTES JUNE 29) 2020* 8 <br /> Board of Selectmen <br /> Minutes <br /> f*% <br /> i Ir.une ./9, 2020 <br /> APPOINTMENTS,& HEARINGS <br /> Public Works Director Catherine Laurent, <br /> Discussion and��i:)roval of ChgDgg_�p, ,9fRoute 151 CorridorJM],,Lroyement <br /> ............_­­................ <br /> (continued) <br /> Ms. Laurent indicated she is pursuing grant funding such as the Complete Streets program, the Safe <br /> Route to School program and other grants offered by the State �ror transportation improvements. <br /> Mitigation funds ($200,000) may be available for use from the Cape Cod Commission. Project limits <br /> and recommendations for reductions were outlined in the memorandum from the DPW Director dated <br /> June 251, 2020. <br /> As an alternative scenario it was suggested the Town consider the installation of sewer pipingat the <br /> time of construction. Low interest loans for wastewater assumptions could be obtained to make the <br /> project financially feasible. The Town of Orleans was noted to have delayed their bid process to <br /> allow for piping which represented a$5 million dollar savings. <br /> Ms. Laurent responded by stating this initiative wasdiscussed by the Selectmen-last year, and the <br /> decision was made to move forward with the Route 151 Corridor Improvement project. Current <br /> plans are at 75% and will be ready for 'Submittal in September. To add the sewer component would <br /> delay the road construction project slated for funding in FY 21-23. However, if the wastewater <br /> initiative was deferred it may delay the wastewater project in the western side of Mashpee to 2029. <br /> It was noted that ry own Meeting authorized $250,000 for engineering associated to wastewater that <br /> could be repurposed for Route 151 engineering. A cost savings might be realized if wastewater <br /> 0 0 0 <br /> piping was installed on-the south side in conjunction with the improvement project. But, <br /> requirements of the State to provide bike lanes and the multi-use path mu-stgi <br /> be constructed for funding <br /> eligibility. <br /> Motion made by Selectman Sgi <br /> herman to authorize the reduction of the project limits associated <br /> to the Route 151 Corridor Improvement project and task the staff to review funding <br /> alternatives to provide additional funds to meet the projected deficit to include the wastewater <br /> design as referenced. <br /> Motion seconded by Selectman O'Hara. <br /> VOTE,* Unanimous. 5-0. <br /> Roll Call Vote, <br /> Selectman Gottlieb, yes Selectman Cotton, yes Selectman O'Hara,yes <br /> Selectman Sherman,yes Selectman Weeden, yes Opposed, none <br />