f <br /> Road was a$16 million project featuring 3 buildings, with a significant amount of progress made <br /> in drawings,plans and environmental work. The development team consisted of Mr. Dempsey, <br /> Cory Fellows of POAH, David Quinn of Housing Assistance Corporation and Steve Tyce, <br /> architect. Environmental engineering was being completed by Brian Kuchar of Horsley-Witten. <br /> Mr. Dempsey noted that this project would be the 10"' collaborative project on Cape between <br /> POAH and HAC, 7 of which have been completed. Financing of the project was being <br /> addressed. <br /> David Quinn, HAC, stated that they managed more than 550 units on the Cape and Islands, <br /> emphasizing the value of partnering with POAH, particularly with their experience in tax credits. <br /> Regarding 950 Falmouth Road, Mr. Quinn referenced Parcel C that had been set aside for <br /> conservation, focusing on Parcels A and B, with structures located on Parcel A, while <br /> wastewater treatment, septic and the leaching field would be located on Parcel B, in an effort to <br /> minimize impacts to the area. Mr. Quinn confirmed that, after finalizing the Development <br /> Agreement in February, HAC/POAH addressed design and survey work for environmental <br /> assessment, including additional soil samples due to illegal dumping found on site, adding that <br /> nothing concerning was found with the study. A wetlands was identified on the northern <br /> property line of the abutting property,which would impact the parking design. A meeting with <br /> Town staff occurred in April, in order to accept feedback for project designs. A Project <br /> Eligibility letter was submitted to DHCD in June to initiate permitting through the Chapter 40B <br /> process, and the developers were awaiting word from the State regarding project suitability. A <br /> Zoom meeting, which was recorded, was made available to abutters from South Cape Resort and <br /> Great Hay Estates, and 10 people were in attendance. Abutters expressed appreciation about <br /> connecting earlier in the process. South Cape Resort expressed concern about building <br /> appearance so additional renderings were being developed to address those concerns. Other <br /> concerns expressed included traffic impacts during construction and once occupied. Mr. Quinn <br /> stated that the developers would remain in touch with the abutters during development of the <br /> site. Filings had also been submitted to the Board of Health for wastewater and Conservation <br /> Commission for wetland issues. It was expected that submission to the ZBA would occur in <br /> August, depending upon Project of Eligibility status from the State. It was hoped that hearings <br /> could occur in the fall. Pre-application for tax credit funding would occur in November 2020, <br /> with full application in February, though Mr. Quinn noted that it typically tools a few rounds to <br /> become eligible. The funding was necessary to initiate construction, but it was hoped it could <br /> begin in 2022. <br /> The Chair inquired about sources of funding and Mr. Quinn responded that, in addition to tax <br /> credit funding,they would be seeking a construction loan, Community Preservation Funds and <br /> county and state home funds and home developer equity. Mr. Dempsey added that funding for <br /> the $15.7 million project($12 million in construction, $3 million in soft costs) sources would <br /> include tax credit equity of$11 million, and soft funds included Affordable Housing Trust of$1 <br /> million, $500,000 in local state home funds, and DEP soft funds of$1.1 million and $3 million <br /> and $250,000 in local funds. <br /> The project was designed as 39 units with 14 1-bedroom apartments, 21 2-bedroom apartments <br /> and 4 3-bedroom apartments. Mr. Quinn noted that the original design of a Vermont style barn <br /> building received feedback requesting a redesign. Although the building remained in the same <br /> 2 <br />