My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1973-Annual Town Report
>
1973-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:37:31 PM
Creation date
1/11/2021 3:37:31 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
1973
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br /> I <br /> 18 <br /> ' Chapter 81 <br /> i The following maintenance was performed on the vari- <br /> ous streets, roads and lanes throughout the Town under a <br /> State Aid program. <br /> Quashnet Rd., G. & S., Oil $6-50.00 <br /> ,i Old Barnstable Rd., G. & S., Oil 650:00 <br /> .1 <br /> Pimilico Pond Rd., G. & S., Oil 1,325.00 <br /> Collins Lane, G. & S., Oil 180.00 <br /> Great Neck Rd., G. & S., Oil 2,410.00 <br /> Red Brook Rd., G. & S., Oil 675.00 <br /> Mono,moscoy Rd., G. & S., Oil 750.00 <br /> Mashpee. Neck Rd., G. & S., Oil 820.00 <br /> Ashers Path, G. & S., Oil 500.00 <br /> i <br /> Total $7,940.00 <br /> Chapter 90 Improvements <br /> j Due to the heavy influx in traffic from Falmouth and <br /> J! Hyannis, basically cement and concrete blocks and sand and <br /> gravel trucks, we were forced to raise and resurface a section <br /> of Route 151 leading from the Mashpee Rotary Circle to the <br /> Town line. The section resurfaced was 15,000 feet long by;26 <br /> feet wide at a cost of $4;500.00. <br /> Chapter 90 Construction <br /> Under Chapter 90 Construction we were able to complete <br /> the project on the Seconsett Island causeway which consisted <br /> of raising the surface of the causeway, inserting a M x 14' <br /> archway connecting Hamlins Pond to Waquoit Bay and lay- <br /> ing a 11/2" type I bituminous surface from the Falmouth town <br /> line to Seconsett Island. The insertion of the archway be- <br /> tween Hamlins Pond and Waquoit Bay has changed Hamlins <br /> Pond from a dead pond to a live bay. <br /> i <br /> The next project scheduled on our Chapter 90 Construe- <br /> tion program is that of Great Neck Road South which you <br /> have probably already seen in construction. <br /> The intention is to reconstruct Great Neck Road South <br /> from Great Hay Road to Red Brook Road taking out some <br /> of the undesireable. curbs and installing,a proper foundation, <br /> then to resurface with a 4" type I bituminous concrete. <br /> We would like to take this opportunity in closing to <br /> thank the 7th District Department of Public Works for their <br />
The URL can be used to link to this page
Your browser does not support the video tag.