My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/19/2021 CAPITAL IMPROVEMENT PROGRAM Minutes
>
01/19/2021 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 2:02:01 PM
Creation date
2/1/2021 10:25:47 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
01/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Improvement Program Committee Minutes January 19 2021*APPROVED* 1-29-2021 <br /> APPOINTMENTS & HEARINGS (con't) <br /> Planning and Construction (con't) <br /> Town of Mashpee <br /> FISCAL YEAR 2022 CAPITAL IMPROVEMENT PROGRAM <br /> Deportment: DPW/Planning&Construction <br /> Submitted by: Catherine Laurent <br /> Summary <br /> Funds Required <br /> Project Prior Funds After 2027for Total Funds <br /> Short Title Appropriated FY2022 Ft2023 FY2024 FY 2025 FY2026 FY2027 Cam letion Required <br /> Floo ring Replacement $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 300,000 <br /> MMHS Field Improvements $ 30,000 $ 7,400,000 $ 7,430,000 <br /> DNR Facility $ 30000 $ 4400000 $ 4,430,000 <br /> Roof Solar System Purchase <br /> MMHS DPW Senior Center 119198 $ 119,198 <br /> QS Library AC Installation $ 75,000 $ 75,000 <br /> MMHS Parking Lot Resurfacing $ 350,000 $ 350,000 <br /> Santuit Pond SolarBee $ S3 303 $ 53,303 <br /> Town Hail Hot/Chilled Water <br /> Piping TBD $ <br /> DPW Vehicle Wash Facility TBD $ - <br /> Sewer Connection or New Septic <br /> System @ TH including parking 500000 $ 500,000 <br /> Fire Alarm System Upgrade @ PD $ 75,000 $ 75,000 <br /> Fire Alarm System Upgrade @ TH $ 75,000 $ 75,000 <br /> HVAC Attic Unit Replacement @ $ <br /> SC TBD - <br /> Boiler Replacement @ TH 150 000 $ 150,600 <br /> Roof Repair/Replacement @ $ 2,300,000 <br /> MHS non-solar $ 2300000 <br /> Sewer Connection to MC WWTF <br /> for QS&KCC $ 300,000 $ 300,000 <br /> Generator Replacement @ MHS $ 150,000 $ 150,000 <br /> Boiler Replacement @ QS TBD $ <br /> MAU Units 6,7,8 Replacement @ $ <br /> QS TBD <br /> Boiler Replacement @ MHS TBD $ <br /> Roof Replacement @ Fire#1 TBD $ <br /> Roof Replacement @ SC TBD $ <br /> A/C Installation on 2nd Floor @ $ <br /> MHS TBD <br /> $ 60,000 $ 12,447,501 $ 700,000 $ 2,600,000 $ 500,000 $ 50,000 $ 60,000 $ $ 16,307,501 <br />
The URL can be used to link to this page
Your browser does not support the video tag.