My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/06/1997 Annual Town Meeting
>
10/06/1997 Annual Town Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 5:04:46 PM
Creation date
3/1/2021 11:49:31 AM
Metadata
Fields
Template:
Town Meeting Warrants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(3) Prior to the start of work, or within hours thereafter, a plan and/or <br /> written narrative describing the nature of the emergency work roust be submitted <br /> to and approved by the Commission or its Agent. <br /> (4) N emergency work may begin until after an on-site meeting with the <br /> lashpee Conservation Agent/Assistant Conservation Agent or a designated <br /> representative of the Commission. <br /> (5) At this on-site meeting, the Agent/Assistant Agent or other designated <br /> representative of the Commission may impose conditions (relating to <br /> work/construction methodology) deemed necessary to protect the wetland values <br /> of Chapter 172 of the Mashpee Code. If so, said conditions will be provided in <br /> writing at the time of said on-site meeting, or as soon thereafter as possible. <br /> Failure to agree to or follow these conditions shall be due cause for stopping all <br /> work. <br /> (6) Upon failure to meet the above requirements, the Commission may order <br /> all such work stopped and, after notice and a public hearing, revoke or modify an. <br /> emergency project approval and order restoration and mitigation measures. <br /> (7) A permit application, as per normal procedures as described in other <br /> sections of this Chapter, may be required by the Commission at any time from. <br /> the commencement of work until 60 days thereafter. Said application, if <br /> required, shall address the emergency work and/or restoration/mitigation work. <br /> deemed,necessary to protect the wetland values of Chapter 172. <br /> Submitted by the Conservation. Commission <br /> Explanation: This revision is necessary because of contradictory language in the earlier <br /> version. It also is designed to more carefully control and clarify emergency work. There have <br /> been problems with work going beyond predetermined limits and where further work to <br /> mitigate damage to wetland interests became necessary. <br /> Motion made by Peter D nizio, <br /> Motion: I move Article 13 be voted as printed In the warrant. <br /> Motion passes at :56 p.m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.