My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/16/2021 PLAN REVIEW COMMITTEE MINUTES Minutes
>
02/16/2021 PLAN REVIEW COMMITTEE MINUTES Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2021 5:01:11 PM
Creation date
3/26/2021 2:40:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLAN REVIEW COMMITTEE MINUTES
Meeting Document Type
Minutes
Meeting Date
02/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'IJv L rn q f Mas l ipee <br /> IG Great Ni,ck `lZoatl,J6rth <br /> Y)lash/-we, A?assac{utu�il,5 0ti64.) <br /> Meeting Minutes <br /> Mashpee Plan Review Committee <br /> Tuesday, February 16, 2021 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Plan Review Members Present: <br /> Dave Morris, Building Commissioner <br /> Drew McManus, Conservation Agent <br /> Catherine Laurent, DPW Director <br /> Glen Harrington, Health Agent <br /> Thomas Rullo, Fire Chief <br /> Evan Lehrer, Town Planner <br /> Joe Callahan, Designee for Town Manager <br /> Dave Morris called the meeting to order at 9:15 a.m. <br /> Project Address: 30 Evergreen Circle <br /> Business Name: Evergreen Energy, LLC <br /> Owner/Agent: Evergreen Energy, LLC <br /> Architect/Engineer: Cape and Islands Engineering, Inc. <br /> Request: Existing one(1) 52 sq. ft. shed. Contractor yard use under§174-25.G. <br /> (13)of the Zoning Bylaws in an Industrial Zone. <br /> Project Address: 41 Evergreen Circle <br /> Business Name: Evergreen Energy, LLC <br /> Owner/Agent: Evergreen Energy, LLC <br /> Architect/Engineer: Cape and Islands Engineering, Inc. <br /> Request: Contractor yard use under§174-25.G. (13) of the Zoning Bylaws in an <br /> Industrial Zone. <br /> Raul Lizardi, Cape & Islands Engineering represented the application, The majority of the properties <br /> are cleared, There is no proposed pavement on Lot 8, however on Lot 3 there is pavement on a <br /> section of the property to house firewood. Lot 3 has some storage of materials ongoing. Lot 8 is being <br /> cleared, shaped and developed. Both lots will have drainage, there are no structures except there's <br /> a small 52 sq. ft. shed toward the left of the existing entrance. The applicant is seeking to get permits <br /> by the Board of Appeals for use of a contractor's yard. But before going to the Board of Appeals, he <br /> is requesting recommendations from Design Review and Plan Review.At Design Review there were <br /> some suggestions to include a landscaping plan showing screening of the properties adjacent to the <br /> neighbors, and add screening along the property lines. <br /> Joe Callahan, Designee for Town Manager: Commented that he agrees that a landscaping plan <br /> should be prepared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.