My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/01/2021 BOARD OF SELECTMEN Minutes
>
03/01/2021 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 5:00:36 PM
Creation date
4/16/2021 9:26:11 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
03/01/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> Board of Selectmen <br /> Minutes <br /> March 1, 2021 <br /> Present: Selectman John J. Cotton, Selectman Thomas F. O'Hara, Selectman Carol A. Sherman, <br /> Selectman Andrew R. Gottlieb, Selectmen David W. Weeden <br /> Town Manager Rodney C. Collins <br /> Assistant Town Manager Wayne E.Taylor <br /> Meeting Called to Order by Chairman Cotton at 7:00 p.m. <br /> Mashpee Town Hall, Waquoit Meeting Room <br /> NEW BUSINESS <br /> Update on Phase 1 of the Wastewater Plan: <br /> Town Manager Rodney C. Collins updated the Select Board on circumstances and financial assumptions related <br /> the Comprehensive Water Resources Management Plan (CWRMP) which recommends a hybrid comprehensive <br /> plan for all areas of Mashpee. This includes the south facing embayment's of Popponesset, Three Bays and <br /> Waquoit Bay which would be addressed cooperatively and collectively with the Towns of Sandwich, Barnstable <br /> and Falmouth as well as adaptive management approaches for nitrogen credit reduction. <br /> Through the shellfish aquaculture remediation program there are nitrogen credit assumptions. The Town may <br /> be required to increase shellfish propagation and implement further adaptive management approaches if the <br /> Town does not act promptly to address the wastewater plan. <br /> A report is expected to be presented by the project engineer GHD, Inc. on March 15, 2021 of estimated cost <br /> projections associated to Phase I of the CWRMP. In moving forward, articles are under review for inclusion in <br /> the final warrant for the May Town Meeting. <br /> The cost projection to address Phase I which includes wastewater and stormwater obligations is $51.2 million <br /> over a 30-year period. Additional costs are projected after the completion of Phase I to address additional <br /> phases associated to the Comprehensive Water Resources Management Plan. <br /> The Clean Water State Revolving Fund (CWSRF) loan requires municipalities to include the cost of operations <br /> in the calculation of expenses. The estimated cost is $1.2 million per year for Phase I. The operational costs <br /> and maintenance of the treatment and collection facility are not included in the $51.2 million cost projection. <br /> The GHD cost analysis would further define the costs and the Sewer Commission would then determine the <br /> rates to offset these costs. In the wastewater plan, it is expected that outside services would be contracted to <br /> control operational functions as well as maintenance assumptions. <br /> It is projected the CWSRF loan would be secured offering principal forgiveness at 0% interest. It is expected the <br /> average subsidy of the CWSRF loan would be 3.3%for the Town of Mashpee as a Group 1 community. Principal <br /> forgiveness is based on a sliding scale, income and demographics. The payback of the CWSRF loan would then <br /> be 3.3% less at a 0% interest rate. <br /> Projects eligible to receive CWSRF loans are also guaranteed eligibility to receive Cape Cod and Islands Water <br /> Protection Fund (CCIWPF) grant funding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.