Laserfiche WebLink
rwn o �G�S�L PC <br /> o annin Board <br /> 16 Great NT ,ck AoadNorth <br /> .Mashpee, Aassa.chusetts 02649 <br /> Update on ongoing projects from Consulting Engineer Ed Pesce <br /> New Seabury <br /> Mr. Pesce mentioned he has done several inspections in the past couple weeks. He got a call from <br /> Kevin Mahoney of New Seabury, they are preparing new road base for paving 25% of the road. The <br /> section facing rock landing, he is trying to reduce the dust because it is next to the main travel way. He <br /> wanted to do a quick base inspection. Mr. Pesce showed him areas he did not like. <br /> Ockway Highlands <br /> Mr. Pesce spoke to developer Jacques Morin, and Mr. Pesce told him about some things he needed to <br /> take action on. He noticed recently they had put down filter fabric in every catch basin but hadn't <br /> repaired anything else. Mr. Pesce took more photos, there are areas showing evidence of rain, but the <br /> good news he is also making sure there is erosion control in the catch basin. <br /> Willowbend <br /> Mr. Pesce went to Riverbend at Willowbend to re-inspect, Mr. Ring with dig it construction was not <br /> available the first visit, one of his staff from Willowbend met Mr. Pesce instead. He told Willowbend to <br /> put down loam and seed and take care of erosion control. There is a detention basin that will start <br /> eroding, Mr. Pesce didn't want the loam to wash away. He saw Dennis Ring yesterday and he told Mr. <br /> Ring of the piles of loam, nothing spread, nothing seeded. Mr. Ring is planning to put down sod in most <br /> of the areas and don't want to do that without the well and irrigation installed. Good excuse, but will <br /> have to repair damage done by rain storms. Following up with these three items <br /> Mr. Pesce wanted to ask one more clarifying question from the presentation, what is the breakdown of <br /> apartments and home ownership? It will be a part of their economic analysis. When you mention EIS, a <br /> Federal term, it is done after a federal environment assessment, also NEPA process. If there is any <br /> impact, there is an EIS they have to with the Commission. There are 15 subject areas, including climate <br /> change. They will be providing a lot of information, Wastewater, storm water, and nitrogen. Understand <br /> balancing some stressors in the community. He would've recommended the presentation before Public <br /> Comment. <br /> Ms. Waygan noted Mashpee Commons submission of documents, can the Planning Board have a <br /> proposed schedule of meet times (for CCC), and was wondering if there is feedback that can be given <br /> from Cape Cod Commission. She wants to sit in, she thinks they are minimizing their potential on the <br /> design and that is their strongest point. <br /> Mr. Lehrer has weekly meetings with CCC and Mashpee Commons. The design guideline is much <br /> more detailed and specific with materials and projections into street etc. It will be presented to CCC for <br /> the Development Agreement. Deputy Director at CCC is standing in place for the interim, they will <br /> establish a subcommittee and will set a schedule of public hearings. Mr. Lehrer will keep everyone <br /> apprised. He will also get a better understanding for mutual conversations involving the Planning Board. <br /> Mr. Lehrer read the Development Agreement regulations for clarifications. When the Development <br /> Agreement is being negotiated by the applicant with both CCC and Municipality, applicant should meet <br /> separately with Municipality and subcommittee in a public meeting to identify areas of compliance and <br /> 16 <br />