My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/06/2021 PLAN REVIEW COMMITTEE MINUTES Minutes
>
04/06/2021 PLAN REVIEW COMMITTEE MINUTES Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 5:00:56 PM
Creation date
6/19/2021 11:51:22 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLAN REVIEW COMMITTEE MINUTES
Meeting Document Type
Minutes
Meeting Date
04/06/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-Iot,rn, qj'A(11a,-.-h1)Co <br /> !li (1rral -A'r'�ck ({uctrl rti'rarll t <br /> Minutes of Meeting <br /> Mashpee Plan Review Committee <br /> Held Tuesday, April 6, 2021 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Plan Review Members Present: <br /> Dave Morris, Building Commissioner <br /> Rodney Collins, Town Manager <br /> Catherine Laurent, DPW Director <br /> Drew McManus, Conservation Agent <br /> Tom Rullo, Fire Chief <br /> Dave called the meeting to order at 9:00 a.m. <br /> NEW HEARINGS <br /> 9:00 am Project Address: 154 Industrial Drive <br /> Business Name: Infinite Power and Storage LLC <br /> Owner/Agent: Greg Ashley, and Kevin O'Grady <br /> Architect/Engineering: Hurricane Hill Development Company <br /> Request: Ground mounted solar array. <br /> Kevin O'Grady represented the application for a solar array to be constructed at 154 Industrial Drive, <br /> The site has an existing radio tower. There are two radio towers on Industrial Drive, the other is <br /> located at 47 Industrial Drive that already has a ground mounted solar array. The site plan depicted <br /> the radio tower, and the location of the solar array situated behind an existing building next to the <br /> radio tower. <br /> Drew McManus: No comments. There are no wetlands in this area. <br /> Catherine Laurent DPW Director: <br /> Catherine asked the following questions; <br /> • What is the elevation of the property before installing the array? <br /> • What additional clearing will be done to regrade the property? <br /> • What is the material underneath the panels? <br /> • Is there a proposed drainage plan? <br /> • Is there vehicular access to the equipment pad, and will there be clearing of land to that <br /> equipment pad. <br /> • If there is an additional driveway, it should be shown on the plan and requires a curb cut <br /> permit. <br /> • A grading plan needs to be provided, and also the drainage should be contained onsite. <br /> • A final grading plan should be submitted, and no storm water should flow onto Industrial <br /> Drive. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.