My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/20/2021 SEWER COMMISSION Minutes
>
05/20/2021 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 5:00:33 PM
Creation date
8/24/2021 1:50:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a <br /> MINUTES <br /> MASHPEE SEWER COMMISSION <br /> THURSDAY, MAY 20, 2021 <br /> MASHPEE TOWN HALL <br /> 16 GREAT NECK ROAD NORTH <br /> MASHPEE, MA 02649 <br /> *Virtual/Remote Meeting* <br /> Use Computer Audio or Call: 646-558-8656 <br /> Meeting ID: 896 1018 9027 <br /> Passcode: 464286 <br /> Present: Tom Fudala, Mike Rapacz, Joe Lyons, Anne Malone, Ken Dunn <br /> Public: Anastasia Rudenko from GHD <br /> 6:00 p.m. — Convene Meeting <br /> Approval of minutes: April 15, 2021 <br /> Mr. Dunn motioned to approve the 4/15/21 minutes. <br /> Mr. Lyons seconded the motion. <br /> Vote: 5-0-0 <br /> Roll Call Vote: <br /> Mr. Fudala; yes <br /> Mr. Rapacz; yes <br /> Mr. Lyons; yes <br /> Mr. Dunn; yes <br /> Ms. Malone; yes <br /> In favor, 5; Opposed, 0; Abstentions, 0 <br /> Thanks to Voters for Approval of$54 Million Phase 1 funds! <br /> Sewer Projects: <br /> - Review and comments on Val Peter / Weston & Sampson comments and GHD responses <br /> to WRRF and Phase 1 collection system 75% designs. <br /> Anastasia Rudenko responded to comments/questions from the 75% designs listed <br /> below. She reminded the Commission that most of the comments were not incorporated <br /> in the 75% design, there are a lot more details to be added between the 75% and 90% <br /> designs.-(Weston & Sampson comments in bold, responses not.) <br /> M212 — Need to confirm UV bath <br /> It's the tank used to hold the cleaning chemicals. <br /> UV Modules — Can the units run at half a bank? <br /> UV intensity can be adjusted. <br /> Chemical drums — containment have ramps? <br /> There will be ramps. <br /> Mr. Dunn asked about handling weight and safety of the drums. Why aren't we using fill <br /> tanks? Can we use something that's completely hands off? <br /> Anastasia said she will follow up with the design team. <br />
The URL can be used to link to this page
Your browser does not support the video tag.