Laserfiche WebLink
i�rnni aiiz <br /> own O `�aS� e 2 Aannina Board <br /> 16 Great Neck RoaddNorth <br /> Mashpee, Massachusetts 02649 <br /> DA vs. DRI <br /> DRI- specific building program for a specific parcel <br /> DA- multiple uses, extended duration of development, framework with predictability for both town and <br /> developer <br /> This also allows for more capacity to housing which we need desperately. <br /> Future discussions <br /> Overview of neighborhood design <br /> Dimension requirements <br /> Parking <br /> Map of Three Zones <br /> Core—58 Acres <br /> Residential, education, agricultural, commercial, industrial, parking facilities and solar, accessory <br /> Transition—52 Acres <br /> Residential, institutional, educational, commercial (except hotels and car repair), solar, accessory <br /> Edge—77 Acres <br /> Residential except mix use (building and commercial), certain institutional and educational, agricultural, <br /> solar, accessory <br /> Ms. Cox asked for questions. <br /> Continued discussion and deliberation of proposed CAC Overlay Proposal <br /> Mr. Balzarini holds up the map. He is counting access ways to exit the project. He has been asking for <br /> a master plan, a layout so he can understand and have a better visual. These roads are backed up <br /> especially in the summer, there needs to be egress for local traffic. Also, fire trucks getting into the <br /> complex. He would like for the Town to have more say than the CCC. <br /> Mr. Chace clarified the piece about traffic as there's a chicken and egg process. They have not gotten <br /> into that detail, but they have hired a traffic engineer. They are meeting with the CCC traffic engineer, <br /> that's the kind of detail they will be coming back with. Obviously the CCC will be looking over our <br /> shoulders and making sure the traffic works as well as their own traffic consultant. He will also be <br /> working with the Town Manager to see how priority can be given to local traffic. Regional road ways go <br /> east to west, we need to figure out collectively how to make north/south traffic work better. The <br /> Selectmen delayed consideration so his team decided to utilize this time to perform more analysis. <br /> Mr. Phelan understands what Mr. Balzarini is talking about. He also noted off Rt. 28 east of Trout Pond <br /> you see the transition area and edge, but there is no diagram of what you plan to do there. He knows it <br /> is difficult but he is looking for something that gives the whole idea. If they follow proposed zoning is <br /> this what it would look like? He wanted to put fire safety issues to bed as all Mashpee bylaws have to <br /> 4 <br />