My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/17/2021 SEWER COMMISSION Minutes
>
06/17/2021 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 5:01:17 PM
Creation date
8/27/2021 12:38:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES <br /> MASHPEE BOARD OF SEWER COMMISSIONERS <br /> THURSDAY, TUNE 17, 2021 <br /> WAQUOIT MEETING ROOM <br /> MASHPEE TOWN HALL <br /> 16 GREAT NECK ROAD NORTH <br /> MASHPEE, MA 02649 <br /> Present: Joe Lyons, Tom Fudala, Ken Dunn, Anne Malone, Mike Rapacz, Brad Pitsley <br /> Public: Anastasia Rudenko, Sarah Greenberg, Audrey Starbard, Howard Butler (via Zoom), Andy <br /> Gottlieb, Ashley Fisher, Chris Gallagher, Alfred Towle <br /> 4:00 p.m. — Convene Meeting Chairman Fudala called the meeting to order at 4:O1pm. <br /> Approval of minutes: May 20, 2021 <br /> Motion: Mr. Lyons moved to approve the 5/20/2021 minutes, Ms. Malone seconded. <br /> Vote: 5-0-0 motion passed <br /> Introduction of Town Engineer: <br /> - New Town Engineer Chris Gallagher (started work June 7) <br /> Sewer Projects: <br /> - Chairman/Town Engineer report on meeting with new private owners and operators of <br /> JBCC water and wastewater facilities <br /> Mr. Fudala, Chris Gallagher and Andy Gottlieb were at a meeting with a private equity <br /> firm, Converge Partners, who will own the facilities on JBCC. We expressed interest as <br /> part of the 151 Project to have the west side of town go to JBCC. We'll find out how <br /> much we actually need to send up there. GHD will do the 30% design and send to <br /> Stantech in 2023. Stantech will do the higher level of design. There was some discussion <br /> on the timeline of when designs are completed and if they will sync up with the project. <br /> It was determined that this will not be a problem, designs can be viewed prior to the <br /> deadlines if necessary. <br /> Andy Gottlieb said we left the meeting with Converge Partners saying we'll evaluate our <br /> offer with our existing plans for Phase 2. Right now their long term plan is to have an <br /> Upper Cape regional facility. They have yet to explain why they are more financially <br /> advantageous to us. <br /> The Town Manager assigned Chris Gallagher to be the liaison and keep in touch with this. <br /> Chris said right now, we're not interested in what they offered. <br /> Mr. Lyons said there's no substantiation, no plan, it's a broken down plant...he cautioned <br /> us to even think about using the base. <br /> GHD/Chairman/Town Engineer report on June 10 WRRF fire protection meeting and any <br /> subsequent activities <br />
The URL can be used to link to this page
Your browser does not support the video tag.