AMENDMENT NO. 3 <br /> TOWN OF MASHPEE, MA AND <br /> GHD INC. <br /> PAGE 3 <br /> 1. Provide one(1)draft version of each memorandum to the Sewer Commission and Town <br /> Transportation Engineering Consultant.Deliverables shall include one(1)PDF electronic <br /> copy and six(6) hard copies for each. Comments received within 30 days of submission <br /> of the draft will be incorporated into one final version of the document. <br /> 2. Provide one(1)final version of each memorandum to the Sewer Commission and Town <br /> Transportation Engineering Consultant.Deliverables shall include one(1)PDF electronic <br /> copy and six (6) hard copies for each. Final memorandum shall be stamped by a <br /> Massachusetts licensed Professional Engineer <br /> B. Prepare preliminary sewer layout drawings (in non-MassDOT format to be incorporated into <br /> the Nathan Ellis Highway (Route 151) Corridor Improvements contract documents by the <br /> Town Transportation Engineering Consultant) and Technical Specifications (sewer related <br /> contract documents in non-MassDOT format) indicating the scope, extent, and character of <br /> the Work to be performed related to sewer infrastructure and furnished by a Contractor for <br /> Phase 2a in accordance with the following table.Additional layout evaluations will be tracked <br /> separately and will be completed as long as they are within the constraints of the not-to- <br /> exceed value of this Amendment. <br /> Table 1 Private and Public Roads Within the Phase 2a Collection System <br /> Roads/Locations Estimated:Length Town/Private l <br /> (Linear Feet) State Road <br /> Route 151 (Old Barnstable Road to 5,500 Town <br /> Mashpee Town Line) <br /> Notes: <br /> 1. Estimated length based on the layout outlined in the'Town of Mashpee Watershed Nitrogen <br /> Management Plan-Final Recommended Plan/Final Environmental Impact Report'(WNMP <br /> RPR), prepared by GHD and dated May 2015, Figure 6-4 — Preliminary Infrastructure by <br /> Subarea(Central PPA). <br /> 1. Develop conceptual plans at a scale determined by GHD for the collection system (no <br /> pump stations) including site plans. It is anticipated that gravity/low pressure sewer and <br /> force main (as applicable) are shown on the same drawing (plan and profile). <br /> Background CAD files shall be provided to GHD by Town's Transportation Engineer <br /> (including road, utilities,survey,etc.). Drawings and technical specifications are intended <br /> to be incorporated by the Town's Transportation Engineer into to the Transportation <br /> Engineer's Bid Set of Contract Documents for road reconstruction; GHD documents are <br /> intended to supplement the complete bid set done by others with only the information <br /> needed for the sewer as defined above. All documents will be provided to Town <br /> Transportation Engineering Consultant for conversion to MassDOT format and <br /> incorporation into the Nathan Ellis Highway(Route 151)Corridor Improvements contract <br /> documents, prepared by the Town Transportation Engineering Consultant. Up to <br /> fourteen (14)drawings are anticipated to be developed as follows: <br /> • General (up to 1 drawing) <br /> • Civil Sewer(linear plan and profile) (up to 10 drawings) <br /> • Civil Details (up to 3 drawings) <br /> Page 3 <br /> https://projects-northamerica.ghd.com/sites/naO4_01/proptownofmashpLepha/ProposaiDocs/11220921-AGR-Mashpee Amend 3 Scope-rev3-working <br /> copy.docx <br />