Laserfiche WebLink
Meeting Minutes <br /> Design Review Committee <br /> Tuesday, August 17, 2021 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Joe had no comments. <br /> Dave asked about the parking space changes. Matt said that when the <br /> building is set in place there will be some grading and shifting of parking <br /> spaces. <br /> Jonathan confirmed that the material of the building is synthetic composite <br /> material. <br /> Joe made a motion that the committee approve 11 Commercial St. as <br /> presented with the recommendations to the landscape plan. Jonathan <br /> seconded. All were in favor. <br /> 8:45 am Project Address: 41 Mercantile Way <br /> Business Name: Contractor Warehouse Bays <br /> Owner/Agent: Capewide Construction, Inc. <br /> Architect/Engineer: Down Cape Engineering, Inc. <br /> Request: Eight (8) Contractor warehouse bays, associated site <br /> work for septic and drainage per included plans totaling 9,972 <br /> sq. ft. <br /> Attorney Christopher Kirrane, represented the applicants for the proposed <br /> building. Also present was Dan Ojala with Down Cape Engineering, and Joao <br /> Junqueira with Capewide Construction. The proposal consists of an eight bay <br /> warehouse situated at 41 Mercantile Way, and is similar to the adjacent lot. <br /> There were some changes made to the site plan as suggested by the Board <br /> of Health Agent and Town Engineer. <br /> Dan said that this building is located in an industrial zone so there are no <br /> residential neighbors or heavy traffic. The building is a typical metal style <br /> Morton Building and will be a very clean and neat lot. The building itself will <br /> have windows, and there are cupolas on the roof. The building will be fully <br /> sprinkled, and a separate area for the utilities. <br /> Jonathan asked the color of the building, and if there will be office space. The <br /> building will be black and gray colors similar to the building next door. Dan <br /> said that there will be just contractor bays, but the septic system is designed <br /> for future office space. There are 22 required parking spaces, and there will <br /> be 33 spaces provided with dedicated handicapped spaces. <br /> 2 <br />