My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/24/2019 ZONING BOARD OF APPEALS Minutes
>
07/24/2019 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 12:22:17 PM
Creation date
10/29/2021 10:10:51 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
07/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A VARIANCE <br /> Petitioner, Bridgestone Development, Inc. <br /> (Owner of record: Faith J. Baptiste, Trustee of the <br /> Cushman Brownie Trust <br /> 9 Shellback Way (Map 81 Parcel 132) <br /> Mashpee, MA 02649 <br /> V-2019-38 <br /> 3. Landscape Plan: Plan No.: L-101: Faith J. Baptiste, Trustee, 9 Shellback Way, <br /> Mashpee, MA, Dated: May 7, 2019, Prepared by: Cape & Islands Engineering, <br /> Drawn by: JVB, Checked by: MC: Revisions.: #1: 6/20/19: Revise Building and <br /> Parking Layout, #2: 7/15/19: Revise Plantings, Add Existing Trees, #3: 8/20/19: <br /> Revise Plantings, #4: 8/22/19 Revise Existing Trees. <br /> 4. Conditioned on all Town Department comments read into the record. <br /> 5. The Board issues a Variance in the amount of fifteen (15) ft. to the natural <br /> vegetative buffer as noted under Section 174-31 fn. 14. <br /> 6. Conditioned upon the State approving the curb cut. <br /> 7. Conditioned upon the cost estimate submitted to the Board by Charles Rowley, <br /> Consulting Engineer dated August 19, 2019 to be paid by the applicant. <br /> 8. Conditioned that Cape & Islands Engineering will contact the Mashpee GIS <br /> Coordinator to determine the correct address for 9 Shellback Way, and provide a <br /> revised plan to be submitted with the new address. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.