Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> DULY 24,2019 <br /> The project will also include approximately seventy one(71)parking spaces including four <br /> (4) handicapped parking spaces. There will also be a queuing lane that can accommodate <br /> up to twenty five (25)vehicles. <br /> The building is a single story with a mezzanine and will occupy 1,800 sq. ft. There will be <br /> a finished section of the basement that will occupy 1,800 sq. ft. The first floor or ground <br /> floor will be used for the dispensing of marijuana products. The mezzanine will be used <br /> for the housing of security office equipment, and employee offices. The basement space <br /> will be used as storage and employees locker room. The facility will be equipped with <br /> state-of-the-art security and surveillance system which exceeds State requirements. The <br /> proposal is to modify the existing Special Permit, expand the building and the use to <br /> include adult use marijuana products, and add additional space as described. <br /> Extraordinary steps have been taken to control the number of patrons on the site and to deal <br /> with issues relative to traffic. In this particular case, the medical patients are taken by <br /> appointment,and the proposal is to have anyone who wishes to purchase products will also <br /> be taken by appointment.The owners can regulate the number of patrons and traffic on the <br /> site at any given hour. The floor plan shows the separation between the medical marijuana <br /> uses and the recreational uses.There is a mechanism for expediting people to and from the - <br /> site. Customers will be able to preorder products online, and schedule an appointment to <br /> pick up their products.There will an expedited lane for medical and recreational uses.Other <br /> than the expedited entry lane,there will be separate entrances and exit points in separate <br /> areas of the building that is dedicated to recreational and medical uses.The facility expects <br /> to have 20 employees, and the proposed hours of operation will be 10:00 am to 8:00 pm, <br /> and those demand hours might be subject to change in the future. <br /> Upon a grant of a Special Permit,this use is allowed in the I-1 Zoning District and the lot <br /> conforms to current zoning.The building as proposed will also conform to zoning.It meets <br /> and exceeds the current 75 ft. setback from the front yard,the 30 ft. from the side yard,and <br /> 50 ft. from the rear yard setback. The maximum building coverage allowed is 25%, the <br /> proposed building will occupy only 8%of the site, and it is essentially a one story building <br /> which is well within the height requirements of the zoning bylaw. <br /> Apart from the specific criteria that is set forth under Section.174-25 J,the applicant must <br /> also demonstrate that they conform to the requirements under 174-24 C which is essentially <br /> a demonstration that the proposed project will not pose a threat to the public,ground water, <br /> air quality,wild life habitat,estuarine systems,and neighboring properties. It's a relatively <br /> passive use, and has been designed to minimize impacts relative to neighboring properties - <br /> and the Town.The host agreement with the Town calls for the installation of a traffic signal <br /> at Echo Road and Rte. 130 to be installed by the year 2020. There are other provisions of <br /> the host agreement that the Board is familiar with relative to the payment fees, and <br /> percentage of gross revenues of the site to be paid to the Town which is spelled out in the <br /> host agreement and has no bearing under zoning aspects of the project. <br /> 2 <br />