Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Petitioner, Thomas E. Fair <br /> (Owner of Record: Evergreen Energy LLC) <br /> 588 Main St. (21 Evergreen Circle) <br /> Mashpee, MA 02649 <br /> SP-2019-44 <br /> The applicants have been operating Fairway Lawn and Tree business for quite a <br /> while. Their base operation is located in Harwich, MA. However, their business has <br /> expanded and they are servicing more clients on the other side of the canal. So this building <br /> will provide their base operations to service customers on the upper Cape and over the <br /> bridges. <br /> The building itself is located in the I-1 Zoning District and conforms to the <br /> requirements of the bylaw. The proposed uses are also allowed uses under the bylaw <br /> provide the Board is willing to grant the appropriate Special Permit relief. The criteria that <br /> is relative to the Special Permit relief is set forth in Sections 174-24 C and C2 that the <br /> Board shall consider prior to granting such relief, such as demand on public facilities, <br /> impacts on surface and ground water quality, impacts on estuaries and other waterway <br /> systems, impacts on traffic flow and safety, impacts on endangered species and impacts on <br /> neighboring properties through excessive noise, vibrations, electrical disturbances and <br /> glare. <br /> The proposed use is relatively passive and most of the activity occurs off site. The <br /> employees will come in and order their appropriate supplies such as fertilizers to supply <br /> their vehicles for purposes of spreading those materials for lawn and tree care services. <br /> Attorney Kirrane said this is largely a storage facility with offices for the applicant's <br /> business. The project was approved by the Design Review and Plan Review committees. <br /> The design of the building was improved as recommended by the Design Review <br /> committee with additional windows and lighting. <br /> Dan Ojala, with Down Cape Engineering spoke to discuss the specifics of the site. <br /> He said that this is an open space subdivision, and is a Cape.Cod Commission DRI with <br /> huge tracks of land dedicated as open space to help protect the environment around this <br /> particular area. He said the project was presented to the Design and Plan Review <br /> committees as mentioned. There were a few Board of Health conditions for the septic <br /> system to be located underneath the parking lot.There were drainage calculations provided, <br /> and he revised the lighting plans to add natural light in all the units. <br /> Ron wanted clarification on the landscape buffer of the property. Dan said that this <br /> lot abuts an industrial zone. Ron asked Evan, Town Planner if a buffer is required between <br /> industrial and commercial. <br /> Attorney Kirrane said that if a commercial abuts a residential zone, it would <br /> increase the setback criteria. It would be a 50 ft. setback criteria. Ron asked the applicant <br /> if they would object to having the Town Engineer review this project. Attorney Kirrane <br /> said that he does not object. <br /> 2 <br />