My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/14/2019 ZONING BOARD OF APPEALS Minutes
>
08/14/2019 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2021 5:01:40 PM
Creation date
10/29/2021 11:04:21 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
08/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Petitioner, Thomas E. Fair <br /> (Owner of Record: Evergreen Energy LLC) <br /> 588 Main St. (21 Evergreen Circle) <br /> Mashpee, MA 02649 <br /> SP-2019-44 <br /> In view of the foregoing, the Board determined the Petitioner met the criteria for a <br /> Special Permit. Upon motion duly made and seconded at the Public Hearings on <br /> Wednesday, August 14, 2019, the Zoning Board of Appeals voted unanimously to issue a <br /> Special Permit to Petitioner,Thomas E. Fair of 21 Evergreen Circle under §174-25 (G) (4) <br /> (6) (14) to allow for construction of a contractor bay warehouse with an accessory office <br /> on property located in an I-1 Zoning District,Map 19 Parcel 10,Mashpee, MA. (Owner of <br /> Record: Evergreen Energy, LLC) with the following conditions; <br /> 1. The Board has determined that the applicant meets all the conditions of a Special <br /> Permit under Mass General Law 40A Section 9. <br /> 2. Site Plan: 21 Evergreen Circle,Mashpee, MA. Prepared for Fairway Lawn&Tree <br /> Service,Date:November 8,2018,Revised: July 17,2019, Scale: 1"=20',Prepared <br /> by: Down Cape Engineering, Inc., Sheet 1 of 2, Signed by: Dan Ojala, No. 40980, <br /> PLS PE, date: 7/17/2019. <br /> 3. Proposed Warehouse/Office: 21 Evergreen Circle, Mashpee, MA. Seminara <br /> Construction Corp.,Date of final issue: 7/16/19, 11/15/18,Date printed: 7/18/2019. <br /> Scale unless otherwise noted: I/4"= 1',Page 1: Title Page,Page 2: Foundation Plan, <br /> Page 3: lst Floor Plan, Page 4: 2nd Floor Plan, Page 5: Cross Section& Elevations, <br /> Page 6: 3rd Overviews. <br /> 4. Conditioned on all Town Department comments read into the record. <br /> 5. Conditioned that the applicant will seek and obtain approval by a Town Consultant, <br /> Charles Rowley prior to an application of a building permit to the Town of <br /> Mashpee. <br /> 6. The applicant will submit a rain garden/drainage maintenance plan to the Building <br /> Inspector with a copy to the Zoning Board of Appeals. <br /> 7. The Board recognizes and approves the two handicapped spaces located in the <br /> front of the building for safety reasons. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.