Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT MODIFICATION (SP-2019-36) <br /> Owner of Record; Triple M Management Company, LLC <br /> 29 Echo Road (Map 19 Parcel 3-9) and, <br /> Owner of Record: Ronald P. Gangemi <br /> 41 Echo Road (Map 19 Parcel 3-8) <br /> Trustee of the 81 Echo Road Realty Trust <br /> Mashpee, MA 02649 <br /> SP-2020-28 <br /> 3. BuildingPlans:lans: Permit Set— Dispensary Phase 1, 29 Echo Road, Mashpee, MA. <br /> Prepared by: 2morrow Studio LLC, Mashpee, MA. Rev. 01: Date: 06/09/20, <br /> Reference: Pricing, 02: Date: 06/12/20, Slab Edits, 02: 07/08/20, Permit Set. A- <br /> 001: Cover Page, A-003: Site Plan, A-100A: Existing Foundation Details, A-101: <br /> Phase One FDN & Floor Plans, A-102: Phase One Lighting & Security Plans, A- <br /> 103: Phase One Floor Areas &Egress Calcs,A-104: Phase One Roof Plan,A-201: <br /> Elevations Existing Dispensary, A-202: Phase One Building Elevations, A-301: <br /> Phase One Building Sections, A-302: Phase One Building Sections, A-303: Phase <br /> One Building Section, A-304: Existing Wall Sections, A-305: Existing Sections, <br /> A-401: Common Wall Sections, A-501: Novabrik Details, A-901: Building <br /> Renderings. Stamped: John B. Connell, No.: 30574, Warren, VT, Registered <br /> Architect, Commonwealth of MA. <br /> 4. Conditioned on all Town Department comments read into the record. <br /> 5. The applicant will complete construction of the 3,700 sf. addition approved in <br /> special permit modification decision SP-2019-36 dated July 24, 2019 ("the <br /> addition") within twenty-four (24) months of this permit modification (SP-2020- <br /> 28) date, ie., on or before August 26, 2022. <br /> 6. Any occupancy permit(s) issued with respect to any temporary structures or <br /> improvements authorized by the special permit modification and the phasing <br /> schedule established thereby shall become void upon the issuance of an occupancy <br /> permit for the addition. <br /> 7. Upon issuance of the occupancy permit for the addition, the applicant shall <br /> forthwith apply for the requisite demolition permit(s) to remove the tents, <br /> structures, and improvements. All such temporary structures and improvements <br /> shall be dismantled and removed from the subject property within 7 days of the <br /> issuance of a demolition permit. Said tent shall not be installed until such time that <br /> an occupancy permit is issued for the temporary additions. <br /> 8. Prior to the issuance of said demolition permit, the applicant must obtain all <br /> permits, approvals and inspections required to disconnect all utilities serving the <br /> temporary structures and improvements, such as plumbing, electric and other <br /> relevant utilities. <br /> 9. The applicant shall provide written updates to the Building Inspector at six month <br /> intervals with respect to the progress on construction of the addition to ensure <br /> compliance with this condition. <br /> 3 <br />