My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/01/2021 BOARD OF SELECTMEN Minutes
>
11/01/2021 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2021 5:00:27 PM
Creation date
11/16/2021 10:40:17 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
11/01/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Select Board <br />Minutes <br />November 1, 2021 <br />APPOINTMENTS & HEARINGS <br />Department of Public Works Director Catherine Laurent: <br />Discussion and Certification of Betterment Assessment for Childs River East: <br />Leather Leaf Lane, Bog River Bend, Fern Gully Pass and Miller Farm Road: <br />Catherine Laurent, Director of Public Works recommended the Board approve the Certification of Betterment <br />Assessment for the Childs River East neighborhood encompassing Leather Leaf Lane, Bog River Bend, Fern <br />Gully Pass and Miller Farm Road. <br />The total cost of contracted work and engineering is $269,329.59. A cost of $4,945.01 to be borne to each of <br />the (60) property owners. This is the last step in the road taking process. <br />Motion made by Selectman Gottlieb to Certify the Betterment Assessment of the Childs River East <br />neighborhood as defined. <br />Motion seconded by Selectman Cotton. <br />VOTE: Unanimous. 5-0. <br />Roll Call Vote: <br />Selectman Sherman, yes Selectman Weeden, yes Selectman Gottlieb, yes <br />Selectman Cotton, yes Selectman O'Hara, yes Opposed, none <br />Discussion and Approval of Award of Contract for the Ockway Bay Boat Ramp Reconstruction: <br />Robert B. Our Marine Division LLC: <br />Four bids were received in response to proposals for the replacement of the ramp at the Ockway Bay Boat <br />Ramp. It was disclosed the project funded by the Community Preservation Act Committee was approved at <br />the October 2021 Town Meeting. <br />It is recommended the contract be awarded to the Robert B. Our Marine Division in the amount of $233,320. <br />This firm was the lowest bidder with exceptional references. The project is time restrictive due to the time of <br />year to construct the coffer dam. Our Marine Division is prepared to move forward with this project within its <br />required schedule. <br />Motion made by Selectman Gottlieb to award the contract for the Ockway Bay Boat Ramp <br />Reconstruction project to Robert B. Our Marine Division, LLC in the amount of $233,320 as <br />recommended. <br />Motion seconded by Selectman O'Hara. <br />VOTE: Unanimous. 5-0. <br />Roll Call Vote: <br />Selectman Sherman, yes Selectman Weeden, yes Selectman Gottlieb, yes <br />Selectman Cotton, yes Selectman O'Hara, yes Opposed, none <br />
The URL can be used to link to this page
Your browser does not support the video tag.